Title Page

  • Conducted on

  • Prepared by

  • Aisles are kept clear and not blocked with product. <br>

  • Work area adequately illuminated.

  • All racking bolted down to floor.

  • Forklift daily checked. Check daily check sheets.

  • Forklift: Warning horns being used and all relevant personnel have current license.

  • Lifting cage present. Check if it is used for lifting people and that harness is available.

  • Ladders/ mobile platform available.

  • Unauthorised entry of personnel blocked.

  • Fire exits clear of any blockage.

  • Fire equipment regularly serviced. Check when it was last serviced.

  • Staff trained in evacuation procedure and are aware of assembly point.

  • First aid kit available and serviced.

  • Load limits on racking visible.

  • Building inspection for the month completed.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.