Information
-
Tap to enter information
-
Permittee/ NPDES Permit #
-
Conducted on
-
Prepared by
-
Rainfall Amount and Date
Offsite Impacts
-
Offsite Impacts
-
Tap to enter information
-
Tap to enter information
-
Wetland Impacts
-
Tap to enter information
-
Tap to enter information
Onsite BMP's
-
Construction Exits need Maintenance
-
Install additional crushed stone to CE
-
Lengthen exit (CE should be a minimum of 50 Feet long)
-
Vehicle Tracking was noted
-
Inappropiate parking: Encourage subcontractors to utilize CE
-
Inlet Protection needs maintenance
-
Remove accumulated sediment from streets and gutters
-
Install spacer blocks behind sock pipe
-
Silt Fence needs maintenance (Silt fence should always be class A)
-
Repair damaged silt fence
-
Remove accumulated sediment from behind silt fence
-
Temporary Stabilization: Seed and mulch is needed
-
Tap to enter information
General Housekeeping
-
Construction Debris was noted: Collect and properly dispose of all construction debris and trash
-
Wash water (Concrete, Paint, Mortar, Etc.) needed to be contained and disposed of properly
-
Portable toilet too close to stromwater inlet. Maintain a minimum distance of 10 feet from inlets
-
Tap to enter information
Permitting, Recordkeeping and Other Misc.
-
Permit and/or rain gauge must be posted on the site
-
Tap to enter information
-
Tap to enter information