Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Site Documentation

  • 1. A current version of the Project Safety Plan is on site?

  • 2. A site Environmental Management Plan is in place?

  • 3. All employees and (sub)contractor personnel on site have completed Site-Specific Inductions?

  • 4. Toolbox / daily pre-start meetings are occurring and have been signed off?

  • 5. Toolbox / daily pre-start meetings include (sub)contractors?

  • 6. Safety issues raised at daily pre-start or toolbox meetings have been noted and addressed?

  • 7. Site safety inspections have been carried out according to a schedule?

  • 8. Have Corrective Actions from prior internal or external safety audits / assessments been addressed?

  • 9. Near Miss Reports are regularly reported and findings / actions discussed?

  • 10. Daily Pre-start check sheets been completed for plant including all subcontractor provided and hired plant?

  • 11. Hazard Registers and Work Method Statements are up-to-date and have been discussed with site personnel & signed by all present?

  • 12. TMP is in place & has been reviewed & updated as required. (ie. Restricted Access, exclusion zones, traffic control). STMS is on Standby?

  • 13. Is there a Work Permit process in place? (E.g. Confined Space, working at Heights, Trenching, Hot Work)?

  • 13.1. Have Permits to Work been completed and are they up to date?

  • 14. There are up to date project specific Safe Work Method Statements / Job Safety Analysis in place for all high risk tasks on site?

  • 15. The SWMS / JSA are reviewed, signed and understood by those undertaking tasks?

  • 16. All (sub)contractor works is undertaken under a SWMS/JSA?

  • 17. All (sub)contractor SWMS / JSA reviewed by & signed off by the Site Manager / Project Manager or HSE Officer?

  • 18. SDS sheets and register on site?

  • 19. Health monitoring required - exposure to hazardous substances?

  • 20. Company policies, committee meeting minutes, emergency evacuation, etc notices are posted for all to see?

Site and Facilities

  • 21. Is there any work in Confined Space?

  • 22. Is there any Hot Work being performed? (Welding / spark emitting)

  • 23. Is Work at Heights being performed? (where one could fall and suffer an injury?)

  • 24. Excavations /Trenching works being performed?

  • 25. Underground / Overhead services clearly identified if present prior to work starting?

  • 26. All plant operators on site licenced, competent and fit for work?

  • 28. Emergency Response Plan in place and understood and have Emergency Assembly Areas been identified?

  • 29. Are emergency contact numbers easily available to personnel on site?

  • 30. Stocked First Aid kits & a minimum of 1 certified first aider on site? (ensure that the kit supplies within "used by date")

  • 31. Fire extinguishers on site, well signed and been serviced and tagged in the last 12 months? (include plant extinguishers).

  • 32. Hazardous substances and dangerous goods clearly identified (labels) and correctly stored?

  • 33. PPE review - all personnel including subcontractors wearing the minimum and appropriate PPE for the job?

  • 34. Site layout effective & allow effective access & egress to site & work zones, crib hut/portable building setup to Safety Environmental Management Plan?

  • 35. Site signage appropriate - visible, accurate?

  • 36. Vehicle movement plan, including parking arrangements for plant / equipment, segregation of pedestrians effective?

  • 37. Site facilities appropriate - fresh drinking water, toilets, shade, extreme weather protection?

  • 38. Has plant refueling and servicing location been identified, prepared and bunded where required?

  • 39. Are all lifting chains on site certified and tagged with SWL listed on the register? Tag out non complying chains and remove from use. Lifting equipment inspected & tagged in past 6 moths?

  • 40. Are all plant/equipment fit for purpose, have compliance plates, registered, ROPS, FOPS, audible alarms, flashing lights & are used within manufacturer's requirements? Tag out non complying plant/equipment & remove from use.

  • 41. Electrical equipment have been tagged and tested (not expired)?

  • 42. Extension leads, cables, hoses, etc are set up appropriately ( off ground and free from potential damage)?

  • 43. RCD'S in use on portable generators and for portable electrical equipment?

  • 44. Potential or likely sources of ignition near flammable liquids or gas?

  • 45. Site been assessed for potential or likely exposure to infectious substances (needle sticks)?

  • 46. Has the fire danger rating been considered and appropriate controls put in place?

Environmental Requirements

  • 47. Are there any special Environmental / Cultural Heritage considerations for this project?

  • 48. Have site personnel been made aware of environmental restricted areas and controls?

  • 49. Have appropriate material / waste / spoil stockpiles / disposal bins been identified, present & risk assessed?

  • 50. Are spill kits required, available on site with instructions for use and operators trained in their use/application?

  • 51. Evidence of unreported incidents - environmental (spills, emissions, noise, impact on native vegetation or wildlife habitat), property damage or personnel injury?

Sign - off and Comments

  • Other Observations?

  • Signature of person inspecting

  • Signature of supervisor on site

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.