1. A current version of the Project Safety Plan is on site?
-
2. A site Environmental Management Plan is in place?
-
3. All employees and (sub)contractor personnel on site have completed Site-Specific Inductions?
-
4. Toolbox / daily pre-start meetings are occurring and have been signed off?
-
5. Toolbox / daily pre-start meetings include (sub)contractors?
-
6. Safety issues raised at daily pre-start or toolbox meetings have been noted and addressed?
-
7. Site safety inspections have been carried out according to a schedule?
-
8. Have Corrective Actions from prior internal or external safety audits / assessments been addressed?
-
9. Near Miss Reports are regularly reported and findings / actions discussed?
-
10. Daily Pre-start check sheets been completed for plant including all subcontractor provided and hired plant?
-
11. Hazard Registers and Work Method Statements are up-to-date and have been discussed with site personnel & signed by all present?
-
12. TMP is in place & has been reviewed & updated as required. (ie. Restricted Access, exclusion zones, traffic control). STMS is on Standby?
-
13. Is there a Work Permit process in place? (E.g. Confined Space, working at Heights, Trenching, Hot Work)?
-
13.1. Have Permits to Work been completed and are they up to date?
-
14. There are up to date project specific Safe Work Method Statements / Job Safety Analysis in place for all high risk tasks on site?
-
15. The SWMS / JSA are reviewed, signed and understood by those undertaking tasks?
-
16. All (sub)contractor works is undertaken under a SWMS/JSA?
-
17. All (sub)contractor SWMS / JSA reviewed by & signed off by the Site Manager / Project Manager or HSE Officer?
-
18. SDS sheets and register on site?
-
19. Health monitoring required - exposure to hazardous substances?
-
20. Company policies, committee meeting minutes, emergency evacuation, etc notices are posted for all to see?
Site and Facilities
-
21. Is there any work in Confined Space?
-
22. Is there any Hot Work being performed? (Welding / spark emitting)
-
23. Is Work at Heights being performed? (where one could fall and suffer an injury?)
-
24. Excavations /Trenching works being performed?
-
25. Underground / Overhead services clearly identified if present prior to work starting?
-
26. All plant operators on site licenced, competent and fit for work?
-
28. Emergency Response Plan in place and understood and have Emergency Assembly Areas been identified?
-
29. Are emergency contact numbers easily available to personnel on site?
-
30. Stocked First Aid kits & a minimum of 1 certified first aider on site? (ensure that the kit supplies within "used by date")
-
31. Fire extinguishers on site, well signed and been serviced and tagged in the last 12 months? (include plant extinguishers).
-
32. Hazardous substances and dangerous goods clearly identified (labels) and correctly stored?
-
33. PPE review - all personnel including subcontractors wearing the minimum and appropriate PPE for the job?
-
34. Site layout effective & allow effective access & egress to site & work zones, crib hut/portable building setup to Safety Environmental Management Plan?
-
35. Site signage appropriate - visible, accurate?
-
36. Vehicle movement plan, including parking arrangements for plant / equipment, segregation of pedestrians effective?
-
37. Site facilities appropriate - fresh drinking water, toilets, shade, extreme weather protection?
-
38. Has plant refueling and servicing location been identified, prepared and bunded where required?
-
39. Are all lifting chains on site certified and tagged with SWL listed on the register? Tag out non complying chains and remove from use. Lifting equipment inspected & tagged in past 6 moths?
-
40. Are all plant/equipment fit for purpose, have compliance plates, registered, ROPS, FOPS, audible alarms, flashing lights & are used within manufacturer's requirements? Tag out non complying plant/equipment & remove from use.
-
41. Electrical equipment have been tagged and tested (not expired)?
-
42. Extension leads, cables, hoses, etc are set up appropriately ( off ground and free from potential damage)?
-
43. RCD'S in use on portable generators and for portable electrical equipment?
-
44. Potential or likely sources of ignition near flammable liquids or gas?
-
45. Site been assessed for potential or likely exposure to infectious substances (needle sticks)?
-
46. Has the fire danger rating been considered and appropriate controls put in place?
Environmental Requirements
-
47. Are there any special Environmental / Cultural Heritage considerations for this project?
-
48. Have site personnel been made aware of environmental restricted areas and controls?
-
49. Have appropriate material / waste / spoil stockpiles / disposal bins been identified, present & risk assessed?
-
50. Are spill kits required, available on site with instructions for use and operators trained in their use/application?
-
51. Evidence of unreported incidents - environmental (spills, emissions, noise, impact on native vegetation or wildlife habitat), property damage or personnel injury?