  • Document No. OHSF-PR-06-11 Version 1 Revision 0 Dated 14/07/2017

  • (Format:- City - Job Pack / Work order No) E.g Aberdeen SO 12345 Always insert City name and Job Pack number if known

  • Location - Enter Location of Audit / Inspection (Please use the - Locate me tab)
  • Location

  • Who is the Contractor operating on behalf of the Principal Contractor?

  • Auditor / Inspector?

Streetworks Audit / Inspection

Select What Type of Audit / Inspection is to be completed.

  • What type of Audit are you doing today?

  • Photographic Evidence (Select ADD to start)

  • Take site photograph (Select Add to add additional site visit
  • Take images of this visit

  • Enter date and Time of Image

  • Quick Site Visit: Any Site Issues?

  • Add Additional Images if required

All personnel conducting site audits and inspections must ensure that all findings are recognised by the Contactor lead person on site (They do not have to agree the findings but must acknowledge your audit)

  • Contractor Signature of recognition of findings

  • Ensure all actions have been assigned and the senior contractor has provided signature recognising findings

Audit Complete? (Check all mandatory fields have been completed)

  • Auditor

  • Name and Signature

Signing Lighting & Guarding

  • Are Courtesy Boards displayed and contain correct information?

  • Do Adequate advance warning signs exist?

  • Are Advanced warnings signs in correct sequence, distance and suitably fixed to prevent being blown down or out of position?

  • Is lighting available for the work area?

Barriers and Work Area

  • Are Traffic / Pedestrian Segregation Barriers fitted?

  • Are Barriers supported by suitable bases and linked together

  • Are all the working equipment contained within the barriered work area (Including spoil)?

  • Is work area of a suitable size to operate safely?

  • Site tidiness (Housekeeping) - is site free of trip hazards (best as Possible)?

  • (Barriers) - Site Comments

  • Add media

Footways

  • Is a pedestrian walkway required?

  • Is the pedestrian walkway the correct width (At least 1.2m)

  • Are footway ramps fitted and fixed?

  • Are pedestrian arrows in place and correctly fitted

  • Are Footway Closed signs in use

  • Is there a safe method for pedestrians to avoid the road / Carriageway whilst passing works?

  • (Footways / Paths) - Site Comments

  • Add Images if required

Welfare

  • Is Drinking water and vessels made available to the operatives?

  • Are washing facilities available?

  • Are toilet facilities within a ten minutes walking distance?

  • Is First Aid Box stocked?

  • What is the expiry date of First Aid Stocks in First Aid Box

  • Fire Extinguishers held (vehicle & Site)

  • What is the expiry date of Fire Extinguishers?

  • Site Observations (Welfare)

  • Add Images if Required

PPE

  • Is PPE in good order? (Clean and maintained)

  • Is PPE being worn correctly and correct for the works being conducted.

  • Is there suitable storage for PPE in the vehicles provided?

Plant & Equipment

  • Is Plant and Euipment required on site at time of audit?

  • Are Plant / Equipment etc in good operational order?

  • Plant & Equipment held in Calibration / Service Date?

  • Click Add for more
  • Equipment Name / Type

  • Calibration / Service due date

  • Site Comments (Plant & equipment)

  • Add Images if required

  • Is there a spill kit available for any environmental issues, fuel leaks etc

Documentation

  • Has Site Risk Assessment been conducted for the current operations?

  • Have all operatives signed the Risk Assessment or evidence of briefing?

  • Are method Statements in use and applicable

  • Are COSHH Assessment and Safety Data Sheets Available for all hazardous substances held on site?

  • Are utility drawings onsite and available

  • Site Comments (Documentation)

  • Add Images if Required

Traffic Management

  • Is Traffic Management in place and Required?

  • Is Traffic Management suitable for location

  • Is Traffic Management set up in accordance with Plan and assessment?

  • Site Comments (Traffic Management)

  • Add Images if Required

Noticing and Competence

  • Are NRSWA Noticing / TTRO's in place and displayed?

  • Is the noticing valid for the current operations?

  • Have Streetworks personnel got the relevant NRSW Cards and plant certificates available for inspection?

  • List Names of operatives sampled

  • Click ADD for another
  • Names of Operative

  • Qualification Expiry Date

  • Site Comments (Noticing)

  • Add Images if Required

Quality Workmanship

  • Backfilled Apparatus and duct

  • Backfill materials

  • Is backfill compaction adequate?

  • Have compaction tests been conducted?

  • Any defects Identified

Chambers

  • Cover and frame seated correctly

All personnel conducting site audits and inspections must ensure that all findings are recognised by the Contactor lead person on site (They do not have to agree the findings but must acknowledge your audit)

  • Contractor Signature of recognition of findings

  • Ensure all actions have been assigned and the senior contractor has provided signature recognising findings

Audit Complete? (Check all mandatory fields have been completed)

  • Auditor

  • Name and Signature

Signing Lighting & Guarding

  • Are Courtesy Boards displayed and contain correct information?

  • Do Adequate advance warning signs exist?

  • Are Advanced warnings signs in correct sequence, distance and suitably fixed to prevent being blown down or out of position?

  • Is lighting available for the work area?

Barriers and Work Area

  • Are Traffic / Pedestrian Segregation Barriers fitted?

  • Are Barriers supported by suitable bases and linked together

  • Are all the working equipment contained within the barriered work area (Including spoil)?

  • Is work area of a suitable size to operate safely?

  • Site tidiness (Housekeeping) - is site free of trip hazards (best as Possible)?

  • (Barriers) - Site Comments

  • Add Images if Required

Footways

  • Is a pedestrian walkway required?

  • Is the pedestrian walkway the correct width (At least 1.2m)

  • Are footway ramps fitted and fixed?

  • Are pedestrian arrows in place and correctly fitted

  • Are Footway Closed signs in use

  • Is there a safe method for pedestrians to avoid the road / Carriageway whilst passing works?

  • (Footways / Paths) - Site Comments

  • Add Images if Required

Welfare

  • Is Drinking water and vessels made available to the operatives?

  • Are washing facilities available?

  • Are toilet facilities within a ten minutes walking distance?

  • Is First Aid Box stocked?

  • What is the expiry date of First Aid Stocks in First Aid Box

  • Fire Extinguishers held (vehicle & Site)

  • Next Fire Extinguisher Test date

  • Site Comments (Welfare)

  • Add Images if Required

PPE

  • Is PPE in good order? (Clean and maintained)

  • Is PPE being worn correctly and correct for the works being conducted.

  • Is there suitable storage for PPE in the vehicles provided?

Plant & Equipment

  • Is Plant and Euipment required on site at time of audit?

  • Are Plant / Equipment etc in good operational order?

  • Plant & Equipment held in Calibration / Service Date?

  • Click Add for more
  • Equipment Name / Type

  • Calibration / Service due date

  • Comments

  • Add Images if Required

  • Is there a spill kit available for any environmental issues, fuel leaks etc

Documentation

  • Has Site Risk Assessment been conducted for the current operations?

  • Have all operatives signed the Risk Assessment or evidence of briefing?

  • Are method Statements in use and applicable

  • Are COSHH Assessment and Safety Data Sheets Available for all hazardous substances held on site?

  • Are utility drawings onsite and available

  • Site Comments (Documentation)

  • Add Images if Required

Traffic Management

  • Is Traffic Management in place and Required?

  • Is Traffic Management suitable for location

  • Is Traffic Management set up in accordance with Plan and assessment?

  • Site Comments (Traffic Management)

  • Add Images if Required

Quality Workmanship

  • Reinstatement Edge Depression

  • Reinstatement trips

  • Reinstatement Surface Depression

  • Reinstatement Crowning

  • Reinstatement Texture Depth

  • Reinstatement other slabs / Tactiles / Pavers

  • Reinstatement Structure

  • Lines and markings replaced (Dependant upon phase of works)

  • Site Comments (Quality)

  • Add Images if Required

Chambers

  • Cover and frame seated correctly

All personnel conducting site audits and inspections must ensure that all findings are recognised by the Contactor lead person on site (They do not have to agree the findings but must acknowledge your audit)

  • Contractor Signature of recognition of findings

  • Ensure all actions have been assigned and the senior contractor has provided signature recognising findings

Audit Complete? (Check all mandatory fields have been completed)

  • Auditor

  • Name and Signature

Signing Lighting & Guarding

  • Are Courtesy Boards displayed and contain correct information?

  • Do Adequate advance warning signs exist?

  • Are Advanced warnings signs in correct sequence, distance and suitably fixed to prevent being blown down or out of position?

  • Is lighting available for the work area?

Barriers and Work Area

  • Are all work areas (Cable blowing and Receiving) set up correctly

  • Are Traffic / Pedestrian Segregation Barriers fitted?

  • Are Barriers supported by suitable bases and linked together

  • Are all the working equipment contained within the barriered work area (Including spoil)?

  • Is work area of a suitable size to operate safely?

  • Site tidiness (Housekeeping) - is site free of trip hazards (best as Possible)?

  • (Barriers) - Site Comments

  • Add Images if Required

Footways

  • Is a pedestrian walkway required?

  • Is the pedestrian walkway the correct width (At least 1.2m)

  • Are footway ramps fitted and fixed?

  • Are pedestrian arrows in place and correctly fitted

  • Are Footway Closed signs in use

  • Is there a safe method for pedestrians to avoid the road / Carriageway whilst passing works?

  • (Footways / Paths) - Site Comments

  • Add Images if Required

Welfare

  • Is Drinking water and vessels made available to the operatives?

  • Are washing facilities available?

  • Are toilet facilities within a ten minutes walking distance?

  • Is First Aid Box stocked?

  • What is the expiry date of First Aid Stocks in First Aid Box

  • Fire Extinguishers held (vehicle & Site)

  • Next Fire Extinguisher Test date

  • Site Comments (Welfare)

  • Add Images if Required

PPE

  • Is PPE in good order? (Clean and maintained)

  • Is PPE being worn correctly and correct for the works being conducted.

  • Is there suitable storage for PPE in the vehicles provided?

  • Site Comments (PPE)

  • Add Images if Required

Plant & Equipment

  • Is Plant and Euipment required on site at time of audit?

  • Are Plant / Equipment etc in good operational order?

  • Plant & Equipment held in Calibration / Service Date?

  • Click Add for more
  • Equipment Name / Type

  • Calibration date / Inspection Date / Service Date

  • Site Comments (Plant & Equipment)

  • Add Images if Required

  • Is there a spill kit available for any environmental issues, fuel leaks etc

Documentation

  • Has Site Risk Assessment been conducted for the current operations?

  • Have all operatives signed the Risk Assessment or evidence of briefing?

  • Are method Statements in use and applicable

  • Are COSHH Assessment and Safety Data Sheets Available for all hazardous substances held on site?

  • Are utility drawings onsite and available

  • Site Comments (Documentation)

  • Add Images if Required

Traffic Management

  • Is Traffic Management in place and Required?

  • Is Traffic Management suitable for location

  • Is Traffic Management set up in accordance with Plan and assessment?

  • Site Comments (Traffic management)

  • Add Images if Required

Noticing and Competence

  • Are NRSWA Noticing / TTRO's in place and displayed?

  • Is the noticing valid for the current operations?

  • Have Streetworks personnel got the relevant NRSW Cards and plant certificates available for inspection?

  • List Names of operatives sampled

  • Click ADD for another
  • Names of Operative

  • Qualification Expiry Dtae

Chambers

  • Cover and frame seated correctly

  • Joint Enclosure Bracket fitted?

  • Joint Enclosure Mounted Correctly

  • Feed Fibre Labelled?

  • Fibre Bundle Labelled?

  • Hangers fitted where required?

  • Spare Tubes Blanked?

  • Connectors Protected?

  • Box Cleaned out?

  • Any defects Identified

All personnel conducting site audits and inspections must ensure that all findings are recognised by the Contactor lead person on site (They do not have to agree the findings but must acknowledge your audit)

  • Contractor Signature of recognition of findings

  • Ensure all actions have been assigned and the senior contractor has provided signature recognising findings

Audit Complete? (Check all mandatory fields have been completed)

  • Auditor

  • Name and Signature

Chamber and Splice Enclosure Quality Check list

  • Splice Point Enclosure ID

  • Splice Point Enclosure Address

  • GPS Location
  • Chamber View Closed

  • Chamber View Open

  • Entry Points Externally

  • Entry Points Internally

  • Storage basket

  • Splice Trays (Font View)

  • Cover and frame seated correctly

  • Comments

All personnel conducting site audits and inspections must ensure that all findings are recognised by the Contactor lead person on site (They do not have to agree the findings but must acknowledge your audit)

  • Contractor Signature of recognition of findings

  • Ensure all actions have been assigned and the senior contractor has provided signature recognising findings

Audit Complete? (Check all mandatory fields have been completed)

  • Auditor

  • Name and Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.