Title Page
-
Site conducted
-
Conducted on
-
Location
-
Engineer's Name
-
Job Reference
-
Builder/Site Representative
-
Site Inspection Description
-
Document Number
INSPECTION ITEMS
PRELIMINARY ACTIVITIES
-
Structural Design is Declared
-
Builders are working of the latest drawings
-
Site Induction Completed by Builder
-
Site is Safe to Enter
-
Surveyor has marked out the locations
-
Temporary bracing is installed (if Required)
-
There is no Neighbouring boundery issue identfied
-
Other
ACTIVITIES - A) STRUCTURAL STEELWORK FABRICATION
-
Ensure the shop drawings have been checked by the design engineer prior to fabrication
-
As directed by the job manager or the design engineer, visit the steel fabricator’s workshop at an early stage to ensure the standard of workmanship is acceptable
-
Ensure testing of the different type of welds is carried out where required in the specification
-
Other
ACTIVITIES - B) STRUCTURAL STEELWORK ERECTION
-
Check that temporary and permanent bracing is being installed to maintain the framework stable
-
Check all structural steel members are correct as per structural steel schedules and tables
-
Check that the correct type of bolts and nuts are being installed
-
Check tightening procedures are correct as per specification. Load indicating washers are best
-
Ensure that the grouting under base plates is carried out as soon as possible
-
Report on any damage to surface paint work requiring touch up
-
It is the contractor’s responsibility to survey the steelwork for plan position and verticality as specified
-
Check that site welding is being carried out competently and tested as specified
-
Check that galvanized bolts and washers are used in exposed situations
-
It is the builder’s and contractor’s responsibilities that the chemical anchors are correctly installed
-
Other
CERTIFICATES/ ATTACHMENTS: CHECKLIST
-
Concrete test certificates every 50 cubic metars to be provided
-
Other
PROCEED TO POURING
-
Not Ok until further information is provided
-
Approved as noted to proceed
-
Approved to proceed to pouring
-
STOP WORK NOTICE
-
Other
GENERAL NOTES
-
Concrete tests to be provided at age 14 and 28 days
-
Curing to be provided for the next 3 days, alternatively a curing compound can be used
-
Steel to be clear from all debris and dust prior to pour
-
Other
ENGINEER'S SIGNATURE
-
Sign