Title Page
-
Name of Sub-Contractor
-
Works being completed
-
Conducted on
-
Prepared by
-
Location
-
No. of Operatives
Inspection
Induction and RAMS
-
Has a completed PQQ been obtained for the Sub-contractor
-
Have the Sub-Contractor completed the Principal Contractor and Modebest inductions?
-
Are the Sub-contractor working to an Approved RAMS?
-
Is the RAMS site specific?
-
Are all foreseable hazards and risks identified within the RAMS
-
Is Task Specific PPE outlined in the RAMS.
-
Are the operatives wearing the PPE as specified in the RAMS
-
Are Hazardous materials being used outlined in the RAMS.
-
Is there a COSHH assessment for all Hazardous material being used on site?
Competency
-
Are all CSCS/CPCS cards in date and applicable for the operations being completed.
-
Have qualifacations been submitted and are they kept on file? SMSTS, Face Fit, Lifting OPs, Diamond Drilling, IPAF, Harness training etc..
-
Is there sufficient supervision present on site?
-
Have the sub- contractor a first aider on site?
Statutory Notices:
-
Are daily Breifings being held by the sub-contractor?
-
Has PUWER, LOLER been completed for tools and equipment being used by the subcontractor?
-
Are HAVS records required and are the being recorded?
-
Are Tools PAT tested and is there evidence of this provided?
-
Are all files been maintained to a good standard?
Operational: Access and Egress
-
Is there safe access and egress into the work area?
-
Is there an adequate exclusion zone present, to protect other trades from harmful substances, noise or any other potential hazards.
-
Is there adequate signage present to warn other operatives of the risks beyond the exclusion zone?
Operational: Working At Height.
-
Are all Operatives observed to be working at height safely?
-
Is all working at height equipment inspected and in good condition? Harnesses, Podiums, Hop ups etc..
-
Are operatives adequatly trained in using the working at height equipment? I.E IPAF.
-
Are ladders in good condition and being used safely?
Operational: Lifting Operations.
-
Has a Lift Plan been submitted for any lifting operations being completed by the Sub-Contractor.
-
Has the lift plan been submitted to the Modebest AP for Review?
-
Are lifts being completed as outlined in the approved lift plan?
-
Is Lifting equipment being maintined adequatly?
-
Is LOLER being completed and kept on file?
-
is there evidence of thorough examination for all lifting equipment.
-
Is there a compentent Slinger present to complete any required lifts? is there evidence of competency on file.
Operational: Fire Precautions
-
Are Fire Extinguishers required for the works being completed?
-
Has a Hot works permit been obtained by the Sub-Contractor?
Operational: Excavations
-
Is there safe access and egress into excavations?
-
Is the excavation sides battered at 45 degree? adequately stepped or<br>supported?
-
Is there sufficient edge protection around the excavations?
Operational: Housekeeping
-
Is there rubbish / waste materials been left behind on site?
-
Are Materials being stored in a safe manner on site?
Operational: Temporary Works
-
Are the sub-contractor using elements that require Temporary works?
-
Are the Sub-contractor following the TW designs provided for the works.
Operational: Lighting & Plant
-
Is sufficient task lighting in place if required?<br>
-
Is equipment in good condition and free from defects?<br>Are 110v cables in good condition and controlled
-
Is large plant segregated from general operatives?
-
Is Plant being operated in a safe manner?
-
Are the Operatives operating the plant adequatly trained? IPAF, CPCS, Lifting OPs etc..
Operational: COSHH & enviromental
-
Is storage of the COSHH materials suitable?Are Propane, Oxygen and other Gas cylinders stored as per Risk Assessment?
-
Are Spill kits available if required?
-
Have COSHH assesments been provided for materials being used on site?
Operational: PPE
-
Are operatives wearing the correct PPE for the task they are completing?
-
Has evidence of face fit training been provided if required?
-
Is LEV required and has an adequate amount been provided?
-
Are operatives using Harnesses and if so has training certs been provided to the site team?
Signature:
-
Audit Completed By: