Title Page

  • Name of Sub-Contractor

  • Works being completed

  • Conducted on

  • Prepared by

  • Location

  • No. of Operatives

Inspection

Induction and RAMS

  • Has a completed PQQ been obtained for the Sub-contractor

  • Have the Sub-Contractor completed the Principal Contractor and Modebest inductions?

  • Are the Sub-contractor working to an Approved RAMS?

  • Is the RAMS site specific?

  • Are all foreseable hazards and risks identified within the RAMS

  • Is Task Specific PPE outlined in the RAMS.

  • Are the operatives wearing the PPE as specified in the RAMS

  • Are Hazardous materials being used outlined in the RAMS.

  • Is there a COSHH assessment for all Hazardous material being used on site?

Competency

  • Are all CSCS/CPCS cards in date and applicable for the operations being completed.

  • Have qualifacations been submitted and are they kept on file? SMSTS, Face Fit, Lifting OPs, Diamond Drilling, IPAF, Harness training etc..

  • Is there sufficient supervision present on site?

  • Have the sub- contractor a first aider on site?

Statutory Notices:

  • Are daily Breifings being held by the sub-contractor?

  • Has PUWER, LOLER been completed for tools and equipment being used by the subcontractor?

  • Are HAVS records required and are the being recorded?

  • Are Tools PAT tested and is there evidence of this provided?

  • Are all files been maintained to a good standard?

Operational: Access and Egress

  • Is there safe access and egress into the work area?

  • Is there an adequate exclusion zone present, to protect other trades from harmful substances, noise or any other potential hazards.

  • Is there adequate signage present to warn other operatives of the risks beyond the exclusion zone?

Operational: Working At Height.

  • Are all Operatives observed to be working at height safely?

  • Is all working at height equipment inspected and in good condition? Harnesses, Podiums, Hop ups etc..

  • Are operatives adequatly trained in using the working at height equipment? I.E IPAF.

  • Are ladders in good condition and being used safely?

Operational: Lifting Operations.

  • Has a Lift Plan been submitted for any lifting operations being completed by the Sub-Contractor.

  • Has the lift plan been submitted to the Modebest AP for Review?

  • Are lifts being completed as outlined in the approved lift plan?

  • Is Lifting equipment being maintined adequatly?

  • Is LOLER being completed and kept on file?

  • is there evidence of thorough examination for all lifting equipment.

  • Is there a compentent Slinger present to complete any required lifts? is there evidence of competency on file.

Operational: Fire Precautions

  • Are Fire Extinguishers required for the works being completed?

  • Has a Hot works permit been obtained by the Sub-Contractor?

Operational: Excavations

  • Is there safe access and egress into excavations?

  • Is the excavation sides battered at 45 degree? adequately stepped or<br>supported?

  • Is there sufficient edge protection around the excavations?

Operational: Housekeeping

  • Is there rubbish / waste materials been left behind on site?

  • Are Materials being stored in a safe manner on site?

Operational: Temporary Works

  • Are the sub-contractor using elements that require Temporary works?

  • Are the Sub-contractor following the TW designs provided for the works.

Operational: Lighting & Plant

  • Is sufficient task lighting in place if required?<br>

  • Is equipment in good condition and free from defects?<br>Are 110v cables in good condition and controlled

  • Is large plant segregated from general operatives?

  • Is Plant being operated in a safe manner?

  • Are the Operatives operating the plant adequatly trained? IPAF, CPCS, Lifting OPs etc..

Operational: COSHH & enviromental

  • Is storage of the COSHH materials suitable?Are Propane, Oxygen and other Gas cylinders stored as per Risk Assessment?

  • Are Spill kits available if required?

  • Have COSHH assesments been provided for materials being used on site?

Operational: PPE

  • Are operatives wearing the correct PPE for the task they are completing?

  • Has evidence of face fit training been provided if required?

  • Is LEV required and has an adequate amount been provided?

  • Are operatives using Harnesses and if so has training certs been provided to the site team?

Signature:

  • Audit Completed By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.