Page 1: Initial questions

  • Conducted on

  • Prepared by Glenna

  • Location 267 Lisgar Street

  • Weather on day of Inspection

Page 2: Main checklist

Front Entrance

  • Walls and Ceiling-Paint/Cracking

  • Flooring and baseboards

  • Closet and tracks-functional

  • lighting

Kitchen

  • Walls

  • Flooring

  • Countertop

  • Caulking

  • Cabinets

  • lighting

  • outlets

  • appliances-installed, packing removed

  • sink and faucet-Run for 5 min, working?, No leaks

  • baseboards

Bathroom

  • Walls and ceiling

  • Flooring

  • vanity and sink

  • toilet-caulking

  • tub and shower surround

  • lighting and mirrors

  • living room/dining room

  • Walls and ceiling

  • Flooring and baseboards

  • lighting

  • windows/patio door

  • baseboard heater

  • Bedroom 1

  • Walls and Ceiling

  • Flooring and baseboard

  • Windows

  • lighting

Bedroom 2

  • Wall and Ceiling

  • Flooring and Baseboard

  • Windows

  • Lighting

Fire Alarms

  • Installed and in working order

Water

  • Test new unit master shut off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.