Information
-
Suntec Concrete Site Safety Audit
-
Project/Job
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Behavior
-
A. PTP reviewed and signed?
-
B. JHAs available on site?
-
C. Mentors assigned?
-
D. Near miss reporting?
-
E. Other?
Work Areas
-
A. General housekeeping?
-
B. Walking-working surfaces?
-
C. Unprotected sides or holes?
-
D. Impalement hazards?
-
E. Sanitary facilities?
-
F. Water-trash receptacles?
-
G. Material storage/lay down?
-
H. Convex-Gang Box?
Job Site Posters
-
A. All OSHA required posters?
-
B. Emergency evacuation plan?
-
C. Emergency contact list?
Health/First Aid
-
A. CPR/First Aid Training
-
B. First Aid Kit
-
C. Eye wash facilities in field?
-
D. Access to eye wash?
-
E. Other
Personal Protective Equipment
-
A. Hard hats?
-
B. Safety glasses?
-
C. Face Shield (if required)?
-
D. Respiratory protection(if required)?
-
E. Hearing protection(if required)?
-
F. Gloves?
-
G. Foot protection?
Fall Protection
-
A. Trained Personal(competent person)
-
B. Worn properly?
-
C. Suitable anchorage point?
-
D. Inspected?
-
E. Stored properly?
-
F. Emergency rescue plan?
Ladders
-
A. Base/footing/set up
-
B. Inspected?
-
C. Proper type for task?
Tools
-
A. In good condition?
-
B. Inspected
-
C. Other
Excavation
-
A. Trained personnel(competent person)?
-
B. Access/Egress
-
C.Soil condition/classification?
-
D. Water accumulation.
-
E. Shoring/Shielding/ Sloping?
-
F. Barricades?
-
G. Spoil pile at least 2' back
-
H. Air monitoring?
-
I. Emergency rescue plan?
Confined Space
-
A. Trained Personnel(competent person)?
-
B. Attendant trained?
-
C. Entrants trained?
-
D. Attendant sign in sheet?
-
E. Permit required/followed?
-
F. Air monitoring?
-
G. Emergency rescue plan?
-
C. Entrants trained?
Electrical
-
A. GFCIs tested?
-
B. Extension Cords?
-
C. Power tools?
-
D. LOTO procedures followed?
-
E. Assured ground inspected?
Fire Safety
-
A. Hot work permit (if required)?
-
B. Fire watch assigned?
-
C. Fire extinguishers inspected?
-
D. Hot work barricades(if required)?
-
E. Gas cans labeled/stored properly?
Rigging And Hoisting
-
A. Capacity tags?
-
B. Hooks and latches?
-
C. Chain falls/come alongs?
-
D. Tag lines?
-
E. Inspected?
-
F. Qualified rigger
-
G. Damage?
Scaffold
-
A. Trained Personnel(competent person)?
-
B. Hand, mid rail and toe board?
-
C. Platform decked and secured?
-
D. Level footing/set up
-
E. Access/Egress?
-
F. Away from power lines?
-
G. Barricades?
-
H. Inspected/ tagged correctly?
Crane Equipment
-
A. Crane inspection?
-
B. Operators manual?
-
C. Crane set up?
-
D. Crane swing radius?
-
E. Operator qualified/certified?
-
F. Designated qualified signaler?
-
G. Fall zone procedures?
-
H. Lift plan?
Equipment
-
A. Equipment inspection and operators manual?
-
B. Operators qualified and certified?
-
C. Spreader bar, trash cans, compensator, concrete bucket, vibrators, C hook, stripping fixtures, fork lift pick point?
-
D. Eco pans, generators, air compressors, trowel machines, cure pump?
-
E. Forklift, boom lift, scissor lift, water truck, Gannon, Georgia buggy?
Hazcom
-
A. Training-right to know?
-
B. SDS for all chemicals on site?
-
C. Proper storage of chemicals?
Other
-
A.
-
B.
-
C.
-
D.
Corrective Actions
-
Enter any corrective actions that will be undertaken
Sign Off
-
Foremen
-
Safety Representative
-
Project Manager
-
Superintendent
-
Safety Carpenter