Title Page
-
Customer
-
Location
-
Country
-
Assigned Commissioner/Technician
-
Start Date & Time
Product
-
Supernova Model
-
Serial Number (S/N)
-
Product Number (P/N)
-
Product label/sticker
Health & Safety
-
Has the installation information been reviewed prior to carrying out the work? (Geolocation, location pictures, supply cut points, specific security procedures, emergency procedures, existence of flammable/explosive gases).
-
Do you have isolated tools, correct Personal Protection Equipment (PPE), LOTO locking kit and everything in good condition to carry out the job safely?
-
Are the work area conditions adequate to guarantee your safety? (visibility, weather (Rain, Storm, strong winds, etc)
-
IMPORTANT: check the conditions of the input cables in the charger. If they are not in a proper condition, STOP work.
Mechanical Inspection
-
External Overall Visual Inspection: (panels, doors, foot cover, screws, hoses, holsters, lights, HMI) Ensure there is no damage
-
Will it require a further visit?
-
Verify correct clearance around the charger (sides: 18", front: 30", rear: 20")
-
Verify left door lock and keys
-
Internal Overall Visual Inspection
-
Verify correct anchorage to the floor
-
Verify input power cables, cable entry plate and glands
-
Verify Panel A protective screen fitted
-
Verify the charger is free from any traces of condensation or water ingress
-
Verify the weather protection seal in all 3 doors
-
Verify door filters are present, in good condition, and not blocked
-
Quantity of CPMs installed
-
Ensure all doors open and close correctly
-
Has this been rectified?
Electrical Inspection
-
Verify correct connection of input cables (3P+PE). It is highly important that phase L1 coming from the mains is connected to L1 on the charger as this can cause AC meter reading issues.
-
Has this been corrected?
-
Check the input cable section is sufficient to cover the demand
-
Verify Supernova's surge protector is in green
-
Verify tightness and connection of all internal cables (pay special attention to the main power cable connections)
-
Has this been corrected?
-
Verify the presence of protections in the main breaker panel
Power up
-
Input AC Voltage: L1-L2 (480V +/- 10%)
-
Input AC Voltage: L1-PE (277V +/- 10%)
-
Input AC Voltage: L2-L3 (480V +/- 10%)
-
Input AC Voltage: L2-PE (277V +/- 10%)
-
Input AC Voltage: L1-L3 (480V +/- 10%)
-
Input AC Voltage: L3-PE (277V +/- 10%)
-
Supernova powers on as expected?
Update checks
-
Supernova's software version on arrival
-
Software updated to version:
-
HMI software version:
-
Verify all 3 door sensors are working correctly
-
Check HMI functionality
-
Has this been rectified?
-
Verify that all lights are working correctly
-
Has this been rectified?
-
Verify that RFID reader is working as expected
-
Has this been rectified?
-
Verify that the fans are working correctly (can be done during a charging test)
-
Has this been rectified?
-
Verify that the POS terminal is working as expected
-
Has this been rectified?
Connectivity
-
Does "Wallbox" show as connected in Webmanager?
-
Authorization method
-
OCPP SIM provider:
-
URL:
-
Charge point identity:
-
Connectivity method
Charge Tests
-
Type of charging test
-
Brand and model of EV(s) used
-
Charging session - Hose 1
-
Charging session - Hose 2
-
Split charge test
Customer requirements
-
Charger left powered on?
-
WebManager power limit set:
Final details
-
Add photos showing Supernova exterior and location
-
Add photos showing Supernova interior (front, left and right sides)
-
Additional comments
Acceptance
-
Customer
-
Wallbox Commissioner/Technician
-
Wallbox certification number (found on your training certificate)