Plant Housekeeping

Plant Housekeeping

  • Each of these items must be done on a daily basis. Assign person in shift meeting to each item so that they know ahead of time what areas the are responsible for.

  • Choose Shift

  • Choose Area

  • Drain all outside dust collectors and clean dust pad

  • Clean and sweep out main floor of pump tower

  • Sweep walkway from Blue dust collector back to staging area

  • Sweep walkway from back of Line N to the Blue Dust collector

  • Check and drain talc reclaim if necessary

  • Sweep walkway from pump tower to main hand wash station

  • Clean around box out silo and surrounding surge bins, confirm I beams and support around box out are clean and free of debris.

  • Clean under north surge bins, confirm all material is labeled and covered.

  • Clean Wash Room

  • Review and clean angel hair trays in raw material surge bins

  • Clean out wash room and organize

  • Choose Area

  • Drain Inside dust collectors, Blue, Line S, Line H.

  • Check and drain talc reclaim if necessary

  • Clean under north surge bins, confirm all material is labeled and covered.

  • Clean around box out silo and surrounding surge bins, confirm I beams and support around box out are clean and free of debris.

  • Clean and sweep out main floor of pump tower

  • Sweep walkway from pump tower to main hand wash station

  • Sweep walkway from back of Line N to the Blue Dust collector

  • Sweep walkway from Blue dust collector back to staging area

  • Clean Wash Room

  • Review and clean angel hair trays in raw material surge bins

Machine Rates

Machine Rates

  • Select area

  • Line K Rate

  • Is machine at Target rate?

  • Line R Rate

  • Is machine at Target rate?

  • Line C Rate

  • Is machine at Target rate?

  • Line E Rate

  • Is machine at Target rate?

  • Line O Rate

  • Is machine at Target rate?

  • Line B Rate

  • Is machine at Target rate?

  • Line G Rate

  • Is machine at Target rate?

  • Line N Rate

  • Is machine at Target rate?

  • Line P Rate

  • Is machine at Target rate?

  • Line S Rate

  • Is machine at Target rate?

  • Line H Rate

  • Is machine at Target rate?

  • Line D Rate

  • Is machine at Target rate?

  • Line V Rate

  • Is machine at Target rate?

  • Line F Rate

  • Is machine at Target rate?

  • Line J Rate

  • Is machine at Target rate?

  • Line L Rate

  • Is machine at Target rate?

  • Line Q Rate

  • Is machine at Target rate?

  • Line U Rate

  • Is machine at Target rate?

Machine Housekeeping

Machine Housekeeping

  • Supervisor must review at minimum 2 machines per shift to confirm housekeeping is being done up to standard. Any items that are not completed need to be reviewed with the operators and confirmed at the end of the shift that they are completed.

  • Machine Selection

  • Machine
  • Select Machine

  • Extruder and motor wiped down

  • All control panels wiped down, including the top

  • Screen changer plug is cut and at acceptable length

  • Cooling water system is clean

  • Feeders on main floor are clean, free of dust and debris. Surrounding floor is swept.

  • Belt feeder has been cleaned out

  • Floor below extruder Vacuum screen is free of oil and all other debris

  • Spare vacuum lines are in place and ready to be used.

  • Pelletizer and platform are clean and free of debris

  • Area around dryer and the dryer platform are clean and free of debris

  • Machine whiteboard is up to date, including grade information operator information.

  • Floor and entire walkway is swept and free of pellets, no water in the floor.

  • Desk and locker area clean and free of debris.

  • Mixer wiped down and free of debris

  • Mixer platform and surrounding floor swept

  • Desk on mezz is clean and free of debris

  • Box breakdown area is swept and organized

  • All boxes are properly covered

  • Entire mezz is swept

  • Review with responsible operator and have the operator sign here!

OP-23 Packaging

  • During each Shift the Supervisor must review at minimum of 2 machines to confirm the procedure OP-23 is being followed. If there are any questions on the procedure, follow attached link directly to the procedure for reference.
    http://acpwebsense/ISO3/Shared%20Documents/OH_Operating%20Procedures/OP-23_%20Packaging.pdf

  • Add Machine

  • Machine
  • Select Machine

  • Generic label process is being followed, boxes are not labeled ahead of time?

  • Bar code and generic label are properly initialed by the operator?

  • All boxes that's are not being filled are properly covered, this includes empty and full boxes.

  • If machine is running bulk boxes, Are the boxes used? Are we placing orange tag on the bag?

  • Any unused FG silo lines are properly capped and locked?

  • The PR-80 sheet is properly filled out with all required information?

  • See attached link for directions for PSA-012 and form PR-80
    http://acpwebsense/ISO3/Shared%20Documents/OH_work%20instructions/Production/Misc%20Work%20Instructions/PSA-012_Box%20weight%20and%20Quality%20verification.pdf

  • All Recycle boxes are properly labeled on all 4 sides?

  • All OSM boxes are properly labeled on all 4 sides?

  • All boxes that are reused have all labels blacked out. This should include raw material boxes, recycle boxes, boxes that are in the breakdown stack etc. confirm that entire area is reviewed before marking, this should include mezzanine level.

  • All raw material boxes are properly labeled, all 4 sides with Grade and code.

  • All raw material boxes are properly covered?

  • Review with responsible operator and have the operator sign here

OP-09 Process Control

  • During each Shift the Supervisor must review at minimum of 2 machines to confirm the procedure OP-09 is being followed. If there are any questions on the procedure, follow attached link directly to the procedure for reference.
    http://acpwebsense/ISO3/Shared%20Documents/OH_Operating%20Procedures/OP-09_%20Process%20Control.pdf

  • Add Machine
  • Choose Machine

  • All process settings (extruder heats, vacuum pressure, screen size, extruder speed) are set to the specific targets listed in the quality control section of the work order

  • Machine formulation is enter correctly?

  • Raw material connections are made according to the change over sheet and mezz record.

  • Run record is properly filled out as required, including heats, feeder totals etc.

  • Any condition on run record that is found to be out of range has been reported to shift Supervisor and the run record has been signed noting the variance.

  • Mezzanine record is properly filled out, this includes the operator verification checks at the beginning of the shift and the material usage numbers at the end of the shift.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.