Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1.0 - Previous Inspection
-
1.1 - The last safety inspection report has been reviewed and been actioned by the lead scaffolder?
-
1.2 - Are there any outstanding actions?
2.0 - Training & Compentency
-
2.1 - Has all the onsite scaffold crew read, and signed the current risk, and method statement?
-
2.2 - Have any health and safety issues raised by the scaffold crew been correctly dealt with?
-
2.3 - Is there evidence of safety leadership by lead scaffolder, foreman, or the competent person?
3.0 - Information, Instruction
-
3.1 - What was the last toolbox talk given?
-
When was the last subject talk given?
-
3.3 - Is the risk and method statement relevant to the current scaffold task?
4.0 - Material storage and housekeeping
-
4.1 - Was there evidance of good stacking and storage practices observed
-
4.2 - Access ways kept clear
-
4.3 - Is the work zone cordoned off with the safety signs in place?
5.0 - Vehicle Movement controls
-
5.1 - Traffic routes sufficient for safe and easy movement
-
5.2 - Vehicles and pedestrians segregated
-
5.3 - Designated loading and unloading areas clearly marked out
-
5.4 - Pedestrian routes clearly marked out, and controlled by barriers, and Signage?
6.0 - Work At Height
-
6.1 - Is the scaffolding task being carried out in accordance NASC SG4:15 with the use of the advanced guardrail system
-
6.2 - Has the scaffold crew adopted the tunnelling technique by boarding from the lift below?
-
6.3 - Single guardrails to non-working lifts at each side where a fall could occur?
-
6.4 - Vehicle base fall protection installed around the lorry bed with safe accessibility?
-
6.5 - Rescue plan in place and relevant to the scope of works
7.0 - Fall Protection Equipment
-
7.1 - Is there evidence of three-monthly inspection and recording of fall arrest equipment up to date.
8.0 - Workmanship/Structural Integrity
-
6.6 - Has the scaffold crew installed secure ladder access at the earliest opportunity between lifts?
-
8.1 - Is the scaffold erected in accordance with NASC TG20:13 (basic scaffolds) or design
-
8.2 - Are there a sufficient number of ties, using correct fittings, and across two standards
-
8.3 - Are the ladders secured at both stiles, correct angle and in good order
-
8.4 - Are all the platform fully boarded with guardrails, and toe boards correctly fixed?
-
8.5 - Are gates or barriers provided at key ladder access points?
9.0 - Signage
-
9. 1 - Standard safety signage posted at the key locations (incomplete & do not use)
-
9. 2 - Is the scaff tag signed and displaying the relevant date
10.0 - Material control
-
10. 1 - Company procedures for checking, maintaining plant & equipment being implemented
-
10.2 - Safe stacking practices observed eliminating unsecured materials?
-
10.3 - Safe storage of materials observed at height?
11.0 - Personal Protective Equipment - Sufficient and correctly being worn
-
11.1 - Hard hat
-
11. 2 - Gloves (various types for site conditions)
-
11. 3 - Ear protection
-
11. 4 - Eye protection
-
11. 5 - High Visibility vest or garment
-
11.6 - Harness & Lanyard correctly applied and adjusted
12.0 - Lifting operations
-
12.1 - Gin wheel correctly position, no greater than 750mm
-
12.2 - Is the area below the lifting point cordoned off
-
12.3 - Have the users knowledge of knots
-
12.4 - Is the rope and wheel free from defects and suitable
-
12.5 - Fittings being raised or lowered in purpose made bags?
Sign Off
-
On site representative
-
Auditor's signature