Title Page
-
Audit Location
-
Conducted On
-
Auditor's Name
-
Is 5S followed and daily check sheets are timely filled?
-
Is a wrist band used while operating a PCB?
-
Is testing done correctly and the testing person is knowledgeable about their work?
-
Documents are under controlled?
-
Work Process is under controlled?
-
Is raw material/product parts stacked or handled safely?
-
Traceability of process/material/product is available?
-
Is preventive maintenance of the machines done timely?
-
Instruments used for process are calibrated and within validity date?
-
Are fire safety equipment available and maintained?
-
Is the medical first-aid box available and maintained properly?
-
Other remarks:-