Information
-
Audit Title
-
Audit No
-
Surveyor
-
Project Manager
-
Is this person now authorised ? Inline with RG8 state Audit no
-
Number of non compliances
-
Date of Audit
-
Client
-
Site Address
-
Job number
-
Building type and brief description
-
Type of survey being undertaken
Project Manager - Contract Review and planning
-
Has the job been set up on tracker correctly ?
-
Are all documents used on the project the latest controlled documents ? Please note them
-
Has a pre survey planning document (RAMS) been completed ?
-
Has the survey been planned sufficiently and are the details / scope in the pre survey planning document (RAMS) accurate ?
-
Where stated as provided by the client in the pre survey planning document have all documents been issued to the surveyor ? Ie building plans, former surveys, annotated refurb drawings etc
-
Has the project manager signed the pre survey planning document (RAMS) and does it contain the name of the client approaving the scope ?
-
Has any identified hazards on site been suitably assessed in the risk assessment and have appropriate control measures been put in place ?
-
In the opinion of the auditor had the level of consultation been correct with the client ?
-
Is the surveyor suitably trained to undertake the works ?
Surveyor - Health and Safety
-
Has a risk assessment been completed ,signed , reviewed and updated where required ?
-
Is the RPE being used in good condition , complete, clean and suitably identified as the surveyors mask ? Is the surveyor clean shaven and can demonstrate a good face fit ?
-
Has the surveyor filled in his monthly exposure sheet and equipment records / ladder checks and are they up to date ?
-
Is all required PPE on site ie Hard hats ,Boots, Gloves, HI Viz jacket, goggles ear defenders and disposable overalls and booties if required ?
-
Does the surveyor have copies of all relevant training records available and are they in date ? P402 ,CSCS ,face fits and WAH etc
Surveyor - Site Equipment
-
Suitable kit box and sample container to segregate tools and samples ?
-
Step ladders - Are they referenced , in good condition and has it been checked by someone competent in the past 6 months ?
-
Any other access equipment checked and documented as safe to use ? Ie MEWPS or Scaffolding
-
Digital camera or camera on tablet ?
-
Tablet available or data sheets being used ?
-
Suitable torch and spare batteries available ?
-
Pens , pencils , ruler , and correction fluid available ( fluid for diagrams only ) ?
-
Resealable sample bags - various sizes available ?
-
Core borers / core samplers available ?
-
Pliers ( Flat nosed and non serrated ideally ) ?
-
Tape and sealant for repairing sample points ?
-
Hammer ?
-
Hand held sprayer with water ?
-
Knife with spare blades ?
-
Screw drivers both pos and flat head ?
-
Chisels ?
-
Magnet ?
-
Polythene sheet and / or Asbestos waste bags of approached type ?
-
Wet wipes ?
-
Sample point stickers and labels ?
-
Asbestos warning stickers ?
-
Is a tool belt or equivalent available and in use when working at height ?
-
Warning signs ?
-
Any additional required equipment I.e lanterns and crawl boards or H Type vacc where required ?
-
Hsg 264 and other relevant guidance documents ?
-
Refurb / Demo - Sledge hammer / lump hammer ?
-
Refurb / Demo - H Type vacuum and is it in service date ?
-
Refurb / Demo - Crowbar ?
-
Refurb / Demo - Plasterboard saw ?
Surveyor - Surveying methodology
-
Logical planning of survey ( walk round , site plans and info review )?
-
Has the surveyor understood the scope and reviewed / amended it where required ?
-
Was sampling conducted correctly ? To be read in conjunction with types of materials sampled also
-
Was the size of samples taken and frequency adequate for the materials being sampled ?
-
Have any samples that have been cross referenced been done so correctly and without compromising the integrity of the survey ?
-
Correct labelling of sample bags ? Include check of previous samples
-
Have all suspect materials been identified , Surveyor to have strong evidence a material isn't likely to contain asbestos to not sample or reference it ?
-
Digital photographs of all sample points taken and of suitable clear quality ?
-
Has a front photo been taken and has the building description been detailed correctly ?
-
Tracker - Has the survey been conducted on a room by room basis and all have individual room numbers ?
-
Envacs - Has the survey been conducted on a room by room basis and are all item points referenced correctly in order ?
-
Has the survey been conducted in logical systematic manor ie top to bottom , walls and then floors , prodding and knocking of materials routinely carried out ?
-
Has the surveyor accessed all relevant areas for the survey type or scope ? Breaking in frequency or accessing all areas for a management survey
-
Have any genuine non accessed areas been recorded correctly and the reason justified in the notes . Quizz whether the PM or client has been contacted to arrange access ?
-
Has site been left in a good tidy state where required and fit for reoccupation ?
-
Have the building plans been marked up correctly with sample points , room numbers , material extents and relevant site description info ?
-
Have material assessments been scored correctly ?
-
Are the recommendations made by the surveyor suitable / correct ?
-
Rest of data inputted correctly ?
-
Is any applicable priority scoring correct ? What details are in place to ensure done accurately
Surveyor - Types of materials sampled and their sampling methodology
-
Boards
-
Composites
-
Spray coatings
-
Thermal insulation
-
Textile ,rope and yarns
-
Papers, cardboard and gaskets
-
Decorative Coatings
-
Other
Summary
-
Please summarise the audit findings and give any required recommendations
Project Manager
-
Score
-
Audit Result - Satisfactory or Non Satisfactory
Surveyor
-
Score
-
Audit Result - Satisfactory or Non Satisfactory
-
Surveyor Name and Signature
-
Auditor Name and Signature