Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Location and Setout

  • Lot Number

  • Chainage, Carriageway, Layer

  • Describe the weather conditions during the final trim and compact.

  • Specified Compaction

  • Is the Lot a Hold Point or Witness Point which requires Client Signoff?

  • Make arrangements for Client inspection. There is a Client Signoff field at the bottom of this ITP.

  • Does the Setout and placement of the Lot conform to the line and levels on the drawing?

  • Attach survey report if available.

  • Take a photo

Material Specification

  • What is the Material Specification, including details of Stabilising additives?

  • Does the material conform to the specification?

  • Attach Delivery Dockets from supplier and any supplier test certificates. If sampled and tested, attach Test Results. If the material is Stabilised Insitu, consider testing to confirm the percentage of additive.

Compaction

    Compaction Test
  • Test Reference Number, Chainage, CL Offset

  • Compaction Test Result ( % ) . Attach Result

  • Pass?

  • Did the Lot pass the Proof Roll? A Proof Roll is undertaken to confirm the compaction is consistent across the Lot and there are no soft spots. Any soft spots should be reworked and retested.

Lot Signoff

  • Lot passed

  • Produce a Non-conformance Report

  • Client Signoff, if required

  • Contractor Signoff

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.