Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • EARTHWORKS TRIM AND COMPACT ITP
    Lots can include areas for Clearing and Grubbing, Sub-grade Trimming and Compacting and compacting around structures.

  • Lot number

  • Chainage, Carriageway

  • Describe the weather conditions during the trim and compact duration.

  • Specified compaction

  • Is this layer a Hold Point or Witness Point which requires Client Signoff?

  • Plan for notice to be given to the client for their involvement. There is a Client Signoff field at the bottom of this ITP.

  • Add a photo

  • Does the embankment position conform to the plan and set out?

  • Attach copy of Survey verification if available.

  • Compaction Test Results (attach test reports)

  • Compaction Result
  • Test reference, e.g. Exact chainage, CL offset.

  • Compaction test result %

  • Pass?

  • Has the Lot passed the Proof Roll? A Proof Roll confirms the area has been compacted consistently and there are no isolated soft spots.

  • Lot Passed

  • If the Lot failed, prepare a NCR.

  • If a HP or WP, Client Signoff

  • Contractor Signoff

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.