Information
-
Document No.
-
Conducted on
-
Engineering Representative conducting "Spot Check"
-
Contractor Name & Company:
-
Where the answer to a question is NO, raise a Non Conformance Report. Include safety non-conformance details on the report.
Department
-
Air Conditioning
-
Building
-
Communications
-
Electrical
-
Maintenance (routine)
-
Painting
-
Plumbing
-
Project
-
Other
Contractor Sign –In Process
-
Have all of the contractor's employees been inducted?
-
Have contractor/s signed in using Upstream?
-
Has the contractor completed a scope of work?
-
Has the contractor completed the necessary permits?
-
SWMS/ JSA's have been provided and reviewed by Building Management?
-
The contractor was observed to (generally) be working in accordance with their SWMS/ JSA?
-
Have the required isolation's been actioned?
-
Are the Contractor identification label visible?
Organisation of the site
-
Work areas are barricaded to prevent non-authorized access?
-
Access/egress is available for facility staff/visitors around work area?
-
Site/work area is free from rubbish and obstructions?
-
Contractor is present in site/work area and is secure from passer-bys entering the site/work area?
-
Openings in floors, trenches etc are covered or barricaded?
-
Scaffolding is secured?
Electrical
-
Electrical equipment – power tools, leads etc are tested and tagged?
-
Leads, plugs, sockets and switches appear to be in good condition (no exposed wires, no mechanical damage)?
-
Portable RCD’s are used for portable electrical equipment?
-
Insulated ladders are used near live exposed electrical equipment?
Prevention of Falls from Heights (>1.8metres)
-
Elevated work platforms have handrails and kick-boards?
-
Perimeter guard railing and screening is in place?
-
Work positioning and fall injury prevention systems are in place?
-
Safe access systems to prevent climbing falls (stairway or ladders)?
-
Single and extension ladders are effectively secured?
Material Storage
-
Building materials are stored within the confines of the work area?
Chemical
-
Material safety data sheets (current)are able to be produced within the work area?
-
Current Safety Data Sheets (SDSs), within five years from the date of issue, are available for all the contractor’s hazardous chemicals on site?<br>SDSs must include Australian emergency contact details?
Personal Protective Equipment
-
PPE is being used, if mentioned on the SWMS/JSA?
MANAGEMENT PLAN
-
Are there any site specific items that are not on this list that need to be addressed: <br>If YES – please list them?
CONSULTATION
-
Is there any issue the contractor wishes to raise?
EVALUATION
-
In your observations is the Contractor meeting their obligations as assessed in this criteria?
-
Have identified Non-Conformance (s) observations been discussed with the contractor?
-
Has the Contractor agreed to/or rectified the non-conformance(s)?
Sign Off?
-
Engineering Sign Off