Title Page

  • Audit Title

  • Document No.

  • Contract

  • Total Eden

Property Outlet

  • Property Outlet Name/Number

  • Property Outlet Size (mm)

  • Property Outlet Location

  • Property Outlet Chainage

Conducted by

  • Observer

  • Conducted on

Contractor Representative

Time on Site

  • Arrive

  • Depart

Concrete Slab

  • 100mm Minimum depth compacted crushed rock bedding installed?

  • Backfill & subgrade under slab compacted?

  • Clearance around precast slab and riser pipe acceptable

  • Precast slab is free from sharp edges & no cracks evident?

Enclosure

  • Property Outlet Label installed on Enclosure?

  • Add media

  • Cage frame as per Construction drawings

  • Cage frame fabricated from Aluminium?

  • Infill panels welded to inside of Angle frame?

  • Bondor panels installed correctly and free from damage?

  • 10mm gap between bottom of gate and concrete slab?

  • Hinged doors open freely and can be latched open?

  • Penetration for Farmer's Valve has been neatly cut out?

  • Locking tabs installed & aligned (locks easily and on centre)?

  • Lock Installed?

  • Telemetry Aerial Installed if required?

  • Add media

  • Space available on slab for future mounting?

Pipes, Valves & Instrumentation

  • Property Outlet size is correct?

Stop/Isolation Valve to Property Outlet (Manually Operated Butterfly Valve)

  • Valve Tag Installed?

  • 150mm (Nominal) clearance between concrete slab and underside of flange?

  • Valve can be opened fully?

  • Valve lockable?

  • Valve orientation installed correctly (no obstructions when open/closed)?

  • Valve handle faces side of enclosure that opens?

  • Bolts correct size/all installed and torqued?

  • Stud bolts correct length with minimum 2 thread pitches after nut?

  • Gasket installed/installed correctly?

Stop/Isolation Valve to Air Release Valve

  • Valve Tag Installed?

  • Valve lockable?

  • Valve orientation installed correctly (no obstructions when open/closed)?

  • Valve handle faces side of enclosure that opens?

  • Bolts correct size/all installed and torqued?

  • Stud bolts correct length with minimum 2 thread pitches after nut?

  • Gasket installed/installed correctly?

Pressure Gauge

  • Pressure Gauge Tag Installed?

  • Bolts correct size/all installed and torqued?

  • Stud bolts correct length with minimum 2 thread pitches after nut?

  • Gasket installed/installed correctly?

Inlet Strainer

  • Inlet Strainer Tag Installed?

  • Installed correct direction (flow arrow correct)?

  • Bolts correct size/all installed and torqued?

  • Stud bolts correct length with minimum 2 thread pitches after nut?

  • Gasket installed/installed correctly?

Water Meter

  • Water Meter Tag Installed?

  • Installed correct direction (flow arrow correct)?

  • Bolts correct size/all installed and torqued?

  • Stud bolts correct length with minimum 2 thread pitches after nut?

  • Gasket installed/installed correctly?

Control/Check Valve

  • Control/Check Valve Tag Installed?

  • Installed correct direction (flow arrow correct)?

  • Bolts correct size/all installed and torqued?

  • Stud bolts correct length with minimum 2 thread pitches after nut?

  • Gasket installed/installed correctly?

  • Oriface plate installed on intake side? (If yes specify size)

  • Oriface plate installed on discharge side? (If yes specify size)

Stop/Isolation Valve to Property Outlet (Lugged Butterfly Valve)

  • Valve Tag Installed?

  • Valve lockable?

  • Valve orientation installed correctly (no obstructions when open/closed)?

  • Clearance between enclosure and face of flange as per Construction drawings?

  • Valve handle faces side of enclosure that opens?

  • Bolts correct size/all installed and torqued?

  • Stud bolts correct length with minimum 2 thread pitches after nut?

  • Gasket installed/installed correctly?

Pipe Supports

  • Pipe adequately supported? (No signs of sagging/strain in flanges or bolts)

  • Pipe Saddle correct size for pipe?

  • Saddle around pipe installed with neoprene, rubber (or equivalent) as to not damage pipe?

Defect Items (To be added to Defect Register)

Other Issues

  • There are no other issues?

Sketches

  • Add drawing

Photos

  • Add media

Sign Off

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.