ANNUAL SWITCHBOARD INSPECTION
-
Service IAW State Legislation, AS3760-2010, WHS Requirements (working with electricity) and the following instructions.
-
Good - No work required Fair - Item/s to be rectified, no impact on performance Poor - Rectification needed ASAP!
-
Check access to switchboard is clear of obstacles
-
Visual check electrical switchboard for correct operation
-
Perform visual check for condition and correctness of earthing
-
Check electrical switchboard and components for excessive heat discolouration, noise and vibration.
-
Visual check switches, contactors, breakers, fuses, wiring and cable terminations for damage
-
Check drawings, instructions, labelling and schedules are in place and up to date
-
Check temperature of components and connections using thermal imaging device
-
Thermal Photo #'s (eg. FLIR0426-FLIR0429)
-
Check load balance. Enter readings in Notes: Red - White - Blue (A)
-
Enter Voltage readings: Red - White - Blue (V)
-
Check all fixings, doors and covers are tight and in place and that all hinges, handles, keys and locks are secured and functioning correctly
-
Ensure all gaskets provide a good seal
-
Check no vermin entry points exist
-
Check fire ratings of electrical switchboards and riser cupboards are preserved
-
Ensure sufficient spare fuses are present (if applicable)
-
Clean all accumulated dust out of enclosed area
-
Condition assessment - Add any general comments here!
-
This is the end of the switchboard inspection! Continue for the RCD testing.
-
Fluke Memory A = Switchboard name (eg. 0001 = DB-AD) (For GPO RCD Injection testing records)
-
Complete Bus/Chassis (Push Button Test ONLY for Light and A.C/Mech) for each section in the Switchboard
BUS/CHASSIS - GPO INJECTION TEST ONLY.
-
Fluke Memory B - Bus/Chassis reference
-
Fluke Memory C - This will be the C/B number. Add any C/B names in this field.
-
Have all RCD's passed the required testing?<br>Please record any faults here and attach photo of faulty component.
-
When all Bus/Chassis are complete, go to: Add new Switchboard. (If more switchboards in the building)
Otherwise go to: Add new building -
When every Switchboard in the building has been tested via GPO, go to: Add new Building.
-
NOTE: Do not complete form until all buildings have been tested. Once the whole site is complete, sign off and create report.
TIP: You can close the form and click 'continue' when ready . -
Completion date/time:
-
Technicians:
- Marcus Battistin
- Brad Madden
- Simon Besford
- Johnathon Whitehead
- Matthew Hicks
- Other:
-
Sign:
-
Customer Name & Signature