Information
-
Client / Site Name:
-
Contract Ref:
-
Site Address:
-
Engineer:
-
Date and Time of Audit
-
Location/Job Ref
Pre Open Panel Checks
-
Was Swift ID card shown?
-
Did they introduce themselves to site contact ?
-
Has there been any problems or changes to the site?
-
Has a visual inspection been carried out?
-
Does all detection devices operate correctly?
-
Does the system conform to the as fitted document?
-
Panel programming set up as per specification ?
Panel Checks
-
Are Grommets present ?
-
Is the panel neat and debris free ?
-
Is the battery dated ?
-
SAB tested ?
Closed Control Panel Checks
-
Has the system been left in customer mode?
-
Is the customer happy with works ?
-
Has all completion paperwork been completed ?
-
If yes - Who with ?
-
Any none conformities, work carried out that requires documenting?
-
Description
-
Any Additional Images
-
Any Additional Information
Engineer's Acceptance
-
For and on behalf of Swift