Information

  • Swinerton Project Name

  • SWINERTON DIVISION:

  • Conducted on

  • Prepared by

  • Project Location
  • Weather conditions

  • On-site Personnel

Safety Assessment

1. Safety Documents/Postings

  • 1.1 OSHA posters/permits/workers comp postings?

  • 1.2 SWP/IIPP reviewed (Orientation-sticker provided and visible)?

  • 1.3 Site Specific Safety Plan?

  • 1.4 Routine Inspections, Monitoring, Audits?

  • 1.5 Job Hazard Analysis (JHA) reviewed and signed?

  • 1.6 Training, Certified Operators certifications on file w/GC & @ Trade Job Trailer?

  • 1.7 Daily Huddle/(PTP) Pre-Task Planning conducted?

2. Emergency Response

  • 2.1 Hospital / Clinic

  • 2.2 CPR Certification

  • 2.3 Emergency Procedures, Reviewed and Displayed at Site?

3. Work Environment

  • 3.1 Safe Work Practices

  • 3.2 PPE (task, conditions, weather)

  • 3.3 Amenities? (Drinking water, toilets, wash areas, lunch rooms, etc)

  • 3.4 First Aid Kits and Equipment on Site, Inspected and Identified?

  • 3.5 Fire Protection (pull rings secured, monthly inspection, secured and "off the ground")

  • 3.6 Signage Posted?

  • 3.7 Safe Lifting / Team Lifting Techniques?

  • 3.8 Risk Controls? (Job Rotation, Lighter Loads, Board Carts, Lifting Equipment, etc)

  • 3.9 Respiratory Protection?

  • 3.10 Lighting (minimum 5 fc in main corridors and "common" work areas; task lights for non-common areas)?

  • 3.11 Trip Hazards (unmarked holes, floor protection, tarps, equipment etc)?

  • 3.12 Housekeeping/Cleanup (dump buggies)?

  • 3.13 Daily Stretch & Flex conducted?

  • 3.14 Is Equipment & Product, stored properly SECURED?

  • 3.15 (Medical) Ante-room/negative air within proper parameters?

  • 3.16 (Medical) Proper Infection Control measures in place (PPE, BARRIERS, ETC.)?

4. Electrical Hazards

  • 4.1 Electrical Cords? (unsafe, damaged, cut, frayed, etc.)

  • 4.2 Lack of GFCI protection?

  • 4.3 Hazardous Issues (overhead electrical lines, near water, overloaded, near hazardous chemicals)?

  • 4.4 Cords off ground (as applicable), out of traffic areas, potential damage hazards avoided?

  • 4.5 Generators (grounded, inspected)?

5. Hazardous Chemical (paint, fuel, oil)?

  • 5.1 (SDS) Safety Data Sheets on Site?

  • 5.2 Spill Containment Equipment?

  • 5.3 Storage Location? (flammables near ignition sources, spills could enter stormwater drains, etc)

  • 5.4 Ventilation?

  • 5.5 Is Fire Protection available (<25') from HazMat containment?

6. Power Equipment (chop saws, p.a.t, screw guns, drills, etc.)

  • 6.1 Safe Work Practices?

  • 6.2 PPE?

  • 6.3 Fire Extinguishers (secured / pin has plastic tab / functioning / missing / inspected/ with in 75ft)?

  • 6.4 Unsafe or incompatible attachments used with equipment?

  • 6.5 Inspection Protocol?

  • 6.6 Certified Operators (P.A.T., Laser, etc.)?

  • 6.7 Unsafe or Damaged Equipment (JoBoxes/Shocks/Handles/Closed Lids, missing or damaged guards, relief / safety devices)?

  • 6.8 Clean-up (dump buggies) "NO TRASH HITS THE FLOOR"

7. Fall Protection

  • 7.1 Safe Work Practices?

  • 7.2 PFAS Inspection Protocol (harness, lanyard, hooks, yo yo, horizontal life line, beam claps

  • 7.3 PFAS Stored Properly?

  • 7.4 Training (awareness)?

  • 7.5 Fall risks (6 ft. or more, including voids, pits, and trenches)?

  • 7.6 Unprotected change of elevation >18"?

  • 7.7 Unsafe or incomplete edge protection?

  • 7.8 Unsafe or uncertified anchor points?

  • 7.9 Rescue Procedures in place, team trained?

8. Concrete

  • 8.1 Inspection Protocol?

  • 8.2 Safe Work Practices?

  • 8.3 Rebar capped?

  • 8.4 Ergonomic?

9. Ladders

  • 9.1 Safe Work Practices

  • 9.2 Is all labeling attached and legible?

  • 9.3 Unsafe or damaged ladders?

  • 9.4 Unsafe positioning/securing of ladders?

  • 9.5 Ladder training (awareness) conducted?

10. Mobile Scaffolds (Perry, Tele Tower, Roll n Fold)

  • 10.1 Safe Work Practices

  • 10.2 Mobile / Rolling Scaffold Wheels Locked or Top Locks?

  • 10.3 Unsafe or Incomplete Scaffold (missing handrails, planks, out riggers etc.)?

  • 10.4 Aluminum / Safway Stair Scaffold

11. Scaffolds (Safway, Fraco, Swing Stage)

  • 11.1 Safe Work Practices?

  • 11.2 Inspection Protocol?

  • 11.3 Is there Safe Access & Egress?

  • 11.4 Training (awareness, competent person)?

  • 11.5 Missing handrails, planks? Incompatible Scaffold Components? Unlabelled or do not meet SAIA standards?

  • 11.6 Safe Work Load (SWL) exceeded? (tools, stored materials, number of persons)

  • 11.7 Certified Operators?

  • 11.8 Weather Conditions (Inclement weather; <29 mph winds) ?

12. Aerial Work Platforms (scissor, boom)

  • 12.1 Safe Work Practices?

  • 12.2 Training (certification on file)?

  • 12.3 Inspection Protocol?

  • 12.4 Certified Operators?

  • 12.5 Is Operators Manual on equipment?

  • 12.6 Training (certification on file)?

  • 12.7 Weather Conditions?

13. Mixers, Pumps

  • 13.1 Safe Work Practices?

  • 13.2 SWPPP?

  • 13.3 PPE?

  • 13.4 Inspection Protocol?

  • 13.5 Containment Equipment?

  • 13.6 Fire Extinguisher (secured, missing, pin has plastic tab)?

  • 13.7 Hoses / Connections?

  • 13.8 Signage Posted?

  • 13.9 Cleanup / Maintenance?

14. Forklift (sit down rider, all terrain)

  • 14.1 Safe Work Practices?

  • 14.2 Certified Operators?

  • 14.3 Inspection Protocol?

  • 14.4 Training (awareness)?

  • 14.5 Does Fork Lift have a Fire Extinguisher attached?

15. Asbestos / Lead

  • 15.1 Safe Work Practices?

  • 15.2 Good Faith Survey Reviewed?

  • 15.3 Procedure Protocol Reviewed (work steps, containment, air monitor)?

  • 15.4 JHA Reviewed / Approved?

  • 15.5 PPE?

  • 15.6 Training (awareness)?

16. HOT WORK

  • 16.1 HOT-WORK PERMIT issued?

  • 16.2 Controlled Access Zone (delineator, tape/flagging, signage, fire blanket/protection, etc.)

  • 16.3 (Welding) Fire Protection provided (combustibles >35'; 1-A:20:BC extinguisher/10# <25')

17. Heavy Construction Equipment

  • 17.1 Equipment inspected?

  • 17.2 Operator Licensed/Certified?

  • 17.3 Equipment being operated in a safe manner?

18. Traffic Management

  • 18.1 Traffic Management Plan (TMP) in place? (Physical barriers, bollards, speed limits, flashing lights, spotters, etc.)

19. Crane

  • 19.1 Safety Plan for lifts reviewed?

  • 19.2 Qualified Riggers (certifications on file w/GC & at Trade job trailer)?

  • 19.3 Certified Crane Operator (NCCO License on file w/GC & at Trade job trailer)?

20. Trenching & Excavation

  • 20.1 Barriers/Delineators-Flagging/Danger tape (fall potential hazard) established?

  • 20.2 5:4:2 rule enforced?

21. Confined Space

  • 21.1 Air Monitoring (pre, during, post)?

  • 21.2 Permit Required?

  • 21.3 DETAILS?

NOTES:

Sign Off

  • Trade Supervisor

  • Trade Supervisor

  • Swinerton Representative

  • Swinerton Safety Inspector

CORRECTIVE ACTIONS

ITEMS REQUIRING ATTENTION ON THE PRECEDING ASSESSMENT, SHOULD BE RECORDED AND RETURNED TO THE SWINERTON DIVISIONAL SAFETY INSPECTOR WITHIN 24 HOURS.

Relative Corrective Action(s)

  • Corrective Action Item (e.g. 1), 2), 3) . . .)?

  • Corrective Action TAKEN?

Corrective Action Personnel

  • Corrective Action by WHO?

  • Corrective Action DATE?

  • Corrective Action(s) Responsible Employee:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.