INFORMATION

  • Document No.

  • Audit Title

  • Swissport ) Tank Farm

  • Conducted on

  • Location : YVR
  • Personnel

Tank Cleaning

  • Empty Tank

  • Dip Tank to verify (at least one Tank)

  • Disable Inlet and Outlet valves

Lock Out

  • Lockout both Inlet and Outlet valves

  • Install blinds both Inlet and Outlet Pipes

  • Open Hatch Cover 1

  • Open Hatch Cover 2

  • Sump Out remaining fuel

  • Vent Tank overnight

Confined Space and PPE

  • Monitor Reading level for Tank

  • Confined Space Respirator

  • Goggles

  • Gloves

  • Hard Hat

  • Harness for Confined Space

  • Ear Plugs

  • Water resistant clothing

Tank Cleaning

  • Sump water out of tank

  • Air-Dry tank

  • Make sure no trace of water

Installation

  • Install Hatch 1 with new hardware

  • Install Hatch 2 with new hardware

  • Remove Blinds from Inlet and Outlet Pipes

  • Remove Lock outs from Inlet and Outlet Valves

  • Final walk around to verify everything is in place

Open Valves

  • Open Valves

  • Fill Tank at slow rate and monitor for leaks

  • Monitor tank hourly while filling to check for leaks of the man way areas GPPM 5.3.4 (g)

Supervisor on Shift

  • Select date

  • Name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.