Audit

Date and Time called in
Date and start time of job
Arrival time at office

Estimated Duration of Job

Job Descritption

Equipment

10k

HV 10k

20k

HV 20k

40k

Hot water pressure washer

Dry vac

Dominator

Sewer jet

Support truck

Roll off truck

Vacuum options

6" rubber

Quantity

4" hose

Quantity

2" hose

Quantity

6" pipe

Quantity

4" pipe

Quantity

2" pipe

Quantity

6" flex

Quantity

4" flex

Quantity

2" flex

Quantity

Pipe trailer

Vac box

Unloading options

Dump- please list location

Decon site-please list location

Off site- please list location

Sludge box

Sludge pump

Job trailer

Water blast accessories

Blast hose

Quantity

Lance

Quantity and size

Stinger

Please list quantity, size and length

Water supply needed

Tips

Type and quantity

Nozzle

Type and quantity

2D

3D

Shotguns

Quantity

Pedals

Quantity

Any special accessories

Please list and quantity needed

Vessel information

Tube

Length

Line

Length

Tank

Diameter

Height

Safety needs

Confined space-please include lifelines

Monitor

Monitors- please list personal or reader, 4 gas, H2S or CLO2

Lockout

Harness/fall protection

Full face respirator

Half face respirator

Air purifying

Supplied air

Protective clothing

Tyvek

Acid Suits

Rain suits

ANY OTHER SPECIAL PPE SPECIAL REQUIRED?

Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.