Title Page
-
Site conducted
- TAQA Neyveli Power Company Private Limited
- TAQA - Housing Colony
- TAQA - Mines
-
Conducted on
-
Prepared by
- P R Karthikeyan
- S Rajavelu
- G Nagendra Prabu
- Dr. B Karthick
- S Senthilkumar
- R Jagadeesan
- P Satheesh
- S Sivakumar
- M Selvakumar
- A Muhturaman
- S Muthukumar
- R Jeevan
- S Sathiyaseelan
- S Ratheesh Kumar
- N Sundararamanan
- E Shaji Kumar
- R Kannan
- V Balamurugan
- V G Bharanitharan
- B Ganapathy
- N R Radhakrishnan
- M P Manikantan
- S Justin Diraviam
- R Senthilkumar
- T Mari Ganesh
- M Pugazhenthi
- K Sivaraman
- K Muthukumaran
- V A Pravinkumar
- Lakshmi Prasad Vittapu
- Raja Venkatesan
- P Velmurugan
-
Zone Observed
- Zone - A
- Zone - B
- Zone - C
- Zone - D
- Zone - E
- Zone - F
- Zone - G
- Zone - H
- Zone - I
- Zone - J
- Zone - K
- Zone - L
- Zone - M
- Zone - N
- Zone - O
- Zone - P
- Observations
-
Exact Location of Observation
-
Photo Log of Observation
-
Observation Category
- House Keeping / Orderliness (Not Maintained)
- Personnel Protective Equipment (Unavailable / Not Used)
- Procedures (Not following the requirement)
- Tools and Equipment Defect
- Position of people (Not in safe position)
- Reactions of people
- Safety Violation
-
Description of Observation
-
Recommended corrective action
-
Responsible Department
- Operation Department
- Mechanical Department
- Electrical Department
- Control & Instrumentation Department
- Stores Department
- Chemical Department
- Admin Department
- Safety Department
- Performance Department
- Fuel Department
- Civil Department
-
Target Date
-
Any violation to TAQA Essential Safety Rules
- Rule 1 – Permit to Work
- Rule 2 – Energy Isolation
- Rule 3 – Ground Disturbance
- Rule 4 – Confined Space Entry
- Rule 5 – Working at Height
- Rule 6 – Lifting Operations]
- Rule 7 – Personal Protective Equipment
- Rule 8 – Driving Safety
- Rule 9 – Management of Change
- Rule 10 – Restricted Area Entry
- Rule 11 – System Override
- Rule 12 – Overhead Electric Power Lines
- Not Applicable