Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site Information
-
Corridor
-
Work Group
-
Work Type
-
From Km To KM Section (Station to Station) Multiple Line Area Single Bi Direction Dual Uni Direction Dual Bi Direction
Pre Work Brief (PWB)
-
Has the PWB been filled in adequately according to SA-WI-02-010?
-
Have the hazards been identified and have controls been put in place?
Worksite Protection Plan (WPP)
-
What type of protection is in place?
-
Has the WPP been completed correctly in accordance to NO-WI-02-010?
-
Has the Diary Log been filled in with appropriate information that includes all dialogue including overlapping limits?
Communication
-
Is the equipment serviceable?
-
Are correct protocols used for communication?
-
Has a second form of communication been identified?
Certificate of Competency
-
Are all workers competent and qualified to complete the task?
-
Do plant operators have the required competency or High Risk License to operate their item of plant?
Work Method Statement (WMS)
-
Are WMS available on site?
-
Have all workers signed the WMS?
-
Is WMS relevant to the task?
-
Are controls set out in the WMS being applied?
-
Are workers wearing appropriate PPE for the task being preformed?
Plant
-
Is the PO aware of on track plant and how it is being managed within the work sites?
-
Does all plant meet the ARTC General Plant Requirements EPP-32-03?
First Aid
-
Are First Aid kits present, in order and in date?
Fatigue Management - WHS-WI-423
-
Have all workers worked less than 12 consecutive shifts in the last 14 days?
-
Has each person worked 12 hours or less in each shift on this job or project?
-
Have all workers had greater than 8 hours break between shifts?
-
Does any worker travel one hour or more to get to or from work?
-
Night Shift - Have any workers been rostered on for more than the maximum four consecutive 12 hour shifts?
Observations
-
Add media