Title Page

  • Site conducted

  • Client

  • Title/Description

  • Contract Number

  • ITP Number

  • Conducted on

  • Prepared by

ITP STAGES

PRE CONSTRUCTION PHASE

DESIGN APPROVAL

  • Execution Class Confirmed by Client Design Representative

  • Please Upload evidence of Execution Class

  • All Taunton Fabrication drawings updated to Construction Status?

  • Please upload the Drawing Register

  • Expedite with customer design approval.

  • ACTION POINT- TAUNTON FABRICATION

  • ACTION POINT - MAIN CONTRACTOR

  • Design approval sign off.

TECHNICAL/COMPETENCE REVIEW

  • Requirements Review Checklist has been undertaken?

  • Please upload copy of Requirements Review and comment on any findings.

  • Please comment on any findings from the review.

  • RWC Sign Off

  • ACTION POINT- TAUNTON FABRICATION

  • ACTION POINT - MAIN CONTRACTOR

  • Review of current Training Matrix - Ensuring all Manufacturing & Site Installation competencies are adequate & Valid.

  • Please identify Skills Gaps:

  • Proceed to Sign off

  • Taunton Fabrication

  • Main Contractor

  • Competence Check Sign Off:

ACCREDITATIONS/STANDARDS

  • Identify Standards Required for this Activity

  • Confirm Standards are current and Taunton Fabrication is accredited.

  • Please upload copy of certs.

  • Taunton Fabrication

  • Main Contractor

  • Competence Check Sign Off:

MATERIAL CONFORMITY/CERTIFICATION EN10204 3.1

  • Material Certs are available and have been ratified

  • Taunton Fabrication Co Ltd

  • Main Contractor

  • Material Conformity Sign Off

EQUIPMENT AND CALIBRATION

  • Review of equipment required throughout the project & Calibration status if appropriate

  • Confirmation that Calibration of equipment is current

  • Please upload calibration certs.

  • Calibration Sign Off

MANUFACTURING PHASE

ISO3834-2 WELD SURVEILLANCE

  • Please identify Component /Assembly ID

  • Is weld surveillance required

  • Please upload Surveillance reports here

  • NDT Requirements & Reports
  • Please Identify component ID's requiring NDT

  • Please Upload NDT Reports

  • PROTECTIVE SURFACES/PAINT THICKNESS/NO PAINT ZONES/SHOT BLASTING
  • Please Identify component ID

  • Are there any 'No Paint Zones' required?

  • Please Identify areas requiring masking.

  • Paint Thickness control checks.

QUALITY CONTROL CHECKS

  • Cover Sheets fully populated with Welders/QC & RWC

  • Final Inspection carried out

SITE INSTALLATION PHASE

METHOD STATEMENTS/RISK ASSESSMENTS

  • To be completed 3 weeks prior to Start

  • Method Statements sent to Client and approval achieved?

  • Please upload copy of approval sheet from client

  • Main Con

  • Employer

  • Approval of Method Statement/Risk Assessments

SPECIFIC TESTING REQUIREMENTS

  • Please identify the test requirements

  • Please upload the Pull out test schedule and results report.

  • Please Upload Connection ID GA

  • Please provide Connection ID being tested

  • Please provide photo of the calibration sticker/certificate of the torque Wrench

  • Upon completion of Torqueing fasteners - Mark the nut with a black line and provide photograph of completed connection.

  • Please Upload Connection GA

  • Please identify the Connection Id

  • Once tightened please Mark the Nut with a solid line & upload a photograph.

  • Please upload Pull out testing Schedule

  • Please provide photo of Calibration Cert. located on Pull out tester

  • Once activity is complete please sign and upload the Pull out test schedule/

  • Add media

COMPLETION OF WORKS

  • Please Upload Completion of works certificate

Sign Off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.