Title Page
-
Site conducted
-
Client
-
Title/Description
-
Contract Number
-
ITP Number
-
Conducted on
-
Prepared by
ITP STAGES
PRE CONSTRUCTION PHASE
DESIGN APPROVAL
-
Execution Class Confirmed by Client Design Representative
-
Please Upload evidence of Execution Class
-
All Taunton Fabrication drawings updated to Construction Status?
-
Please upload the Drawing Register
-
Expedite with customer design approval.
-
ACTION POINT- TAUNTON FABRICATION
- I - Inspection
- T - Test
- W - Witness Point
- H - Mandatory Hold Point for Inspection
- R - Document Review
- S - Surveillance
- E - Execution
- RE - Records
- Not Applicable
-
ACTION POINT - MAIN CONTRACTOR
- I - Inspection
- T - Test
- W - Witness Point
- H - Mandatory Hold Point for Inspection
- R - Document Review
- S - Surveillance
- E - Execution
- RE - Records
- Not Applicable
-
Design approval sign off.
TECHNICAL/COMPETENCE REVIEW
-
Requirements Review Checklist has been undertaken?
-
Please upload copy of Requirements Review and comment on any findings.
-
Please comment on any findings from the review.
-
RWC Sign Off
-
ACTION POINT- TAUNTON FABRICATION
- I - Inspection
- T - Test
- W - Witness Point
- H - Mandatory Hold Point for Inspection
- R - Document Review
- S - Surveillance
- E - Execution
- RE - Records
- Not Applicable
-
ACTION POINT - MAIN CONTRACTOR
- I - Inspection
- T - Test
- W - Witness Point
- H - Mandatory Hold Point for Inspection
- R - Document Review
- S - Surveillance
- E - Execution
- RE - Records
- Not Applicable
-
Review of current Training Matrix - Ensuring all Manufacturing & Site Installation competencies are adequate & Valid.
-
Please identify Skills Gaps:
-
Proceed to Sign off
-
Taunton Fabrication
- I - Inspection
- T - Test
- W - Witness Point
- H - Mandatory Hold Point for Inspection
- R - Document Review
- S - Surveillance
- E - Execution
- RE - Records
- Not Applicable
-
Main Contractor
- I - Inspection
- T - Test
- W - Witness Point
- H - Mandatory Hold Point for Inspection
- R - Document Review
- S - Surveillance
- E - Execution
- RE - Records
- Not Applicable
-
Competence Check Sign Off:
ACCREDITATIONS/STANDARDS
-
Identify Standards Required for this Activity
- BS EN 1090-2_2008+A1_2011 EXC 2
- ISO3834-2 Welding Standard
- ISO14001 Environmental Standard
- ISO45001 Health and Safety Standard
- NSSS 7thAddition
-
Confirm Standards are current and Taunton Fabrication is accredited.
-
Please upload copy of certs.
-
Taunton Fabrication
- I - Inspection
- T - Test
- W - Witness Point
- H - Mandatory Hold Point for Inspection
- R - Document Review
- S - Surveillance
- E - Execution
- RE - Records
- Not Applicable
-
Main Contractor
- I - Inspection
- T - Test
- W - Witness Point
- H - Mandatory Hold Point for Inspection
- R - Document Review
- S - Surveillance
- E - Execution
- RE - Records
- Not Applicable
-
Competence Check Sign Off:
MATERIAL CONFORMITY/CERTIFICATION EN10204 3.1
-
Material Certs are available and have been ratified
-
Taunton Fabrication Co Ltd
- I - Inspection
- T - Test
- W - Witness Point
- H - Mandatory Hold Point for Inspection
- R - Document Review
- S - Surveillance
- E - Execution
- RE - Records
- Not Applicable
-
Main Contractor
- I - Inspection
- T - Test
- W - Witness Point
- H - Mandatory Hold Point for Inspection
- R - Document Review
- S - Surveillance
- E - Execution
- RE - Records
- Not Applicable
-
Material Conformity Sign Off
EQUIPMENT AND CALIBRATION
-
Review of equipment required throughout the project & Calibration status if appropriate
-
Confirmation that Calibration of equipment is current
-
Please upload calibration certs.
-
Calibration Sign Off
MANUFACTURING PHASE
ISO3834-2 WELD SURVEILLANCE
-
Please identify Component /Assembly ID
-
Is weld surveillance required
-
Please upload Surveillance reports here
NDT Requirements & Reports
-
Please Identify component ID's requiring NDT
-
Please Upload NDT Reports
PROTECTIVE SURFACES/PAINT THICKNESS/NO PAINT ZONES/SHOT BLASTING
-
Please Identify component ID
-
Are there any 'No Paint Zones' required?
-
Please Identify areas requiring masking.
-
Paint Thickness control checks.
QUALITY CONTROL CHECKS
-
Cover Sheets fully populated with Welders/QC & RWC
-
Final Inspection carried out
SITE INSTALLATION PHASE
METHOD STATEMENTS/RISK ASSESSMENTS
-
To be completed 3 weeks prior to Start
-
Method Statements sent to Client and approval achieved?
-
Please upload copy of approval sheet from client
-
Main Con
- I - Inspection
- T - Test
- W - Witness Point
- H - Mandatory Hold Point for Inspection
- R - Document Review
- S - Surveillance
- E - Execution
- RE - Records
- Not Applicable
-
Employer
- I - Inspection
- T - Test
- W - Witness Point
- H - Mandatory Hold Point for Inspection
- R - Document Review
- S - Surveillance
- E - Execution
- RE - Records
- Not Applicable
-
Approval of Method Statement/Risk Assessments
SPECIFIC TESTING REQUIREMENTS
-
Please identify the test requirements
- PULL OUT TESTING
- HSFG BOLTS TORQUE REQUIREMENTS
- FASTENING CONFIRMATION & MARKING
- CONFIRMATION OF 'NO PAINT' SURFACES
-
Please upload the Pull out test schedule and results report.
-
Please Upload Connection ID GA
-
Please provide Connection ID being tested
-
Please provide photo of the calibration sticker/certificate of the torque Wrench
-
Upon completion of Torqueing fasteners - Mark the nut with a black line and provide photograph of completed connection.
-
Please Upload Connection GA
-
Please identify the Connection Id
-
Once tightened please Mark the Nut with a solid line & upload a photograph.
-
Please upload Pull out testing Schedule
-
Please provide photo of Calibration Cert. located on Pull out tester
-
Once activity is complete please sign and upload the Pull out test schedule/
-
Add media
COMPLETION OF WORKS
-
Please Upload Completion of works certificate