Information
-
Migration Reference (Auto Don't Change)
-
Engineer Quicklook id ?
-
Store Name ?
-
Store Number ?
-
Date of Migration
07.NCR Migration Activity
-
Need to add Alarm Fob Refernce details section
Change ISD to Gryphon doors
Need to look at Blue Box contenst section for multiple key sets
ATM #1 Migration
-
7.1 Does the ATM have Inner Safe Doors ?
-
7.1.1 Does the G1 have a Battery Low Error?
-
7.1.1.1 Have the Batteries been Replaced ?
-
7.1.2 Confirm new G1 ISD keys applied as per EMDF
-
7.1.2.1 What Issue stopped the G1 ISG Code being applied:
-
7.1.2.2 Confirm Region Key Code Used
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 38
- 39
- 40
- 41
- 43
- 44
- 45
- 47
- Other
-
7.1.2.3 While was "Other" selected ?
-
7.1.3 Confirm new G2 ISD keys applied as per EMDF
-
7.1.3.2 Confirm Cash Code Used
-
7.1.3.3 Confirm Engineer Code Used
-
7.1.3.1 What Issue stopped the G2 ISG Code being applied:
ATM#1 Cencon Lock Start
-
7.2 Note NEW Cencon Serial #?
-
7.3 Replace Cencon Lock Now
-
7.4 OLD Cencon Serial #?
-
7.5 Call AMC and request 6 Digit code to program Blue Box with, Use Store Number as the Reference:
-
7.5.1 New Blue Box Code from AMC, To be used later ?
-
7.6 Call AMC for Open & Close codes: Quote "TB Migration Project"
-
7.6.1 Open and Close Test Successful?
-
7.6.2 Detail Issue:
-
7.6.3 Replace with the "spare" Lock back if Necessary
-
7.6.4 Spare Lock Used?
-
7.6.5 Serial No of New Lock
-
7.6.6 Final Test Successful ?
-
7.6.6.1 Place NCR security label on door and confirm completed
-
7.6.6.2 Detail why the label was not applied?
-
7.7 Time the 1st ATM was completed
First Handover to Loomis
-
7.8 Have Loomis Arrived Onsite?
-
7.8.1 Start Work on Next ATM, Hand Over when Loomis arrive
Or if Single Site Escalate to Control
7.9.3 NCR to Loomis ATM#1 and Key Handover
-
7.9.4 Hand Over Start?
-
7.9.5 Keys to be Handed Over
-
7.9.5.2 Key Count Including Alarm Fob
-
7.9.5.1 Reference Code for Key Set handed Over?
-
7.9.5.2 Reference Code for Alarm Fob handed Over?
-
7.9.6 Alarm Pin code to Hand Over
-
7.9.6.1 Does Panel have a Pin Number?
-
7.9.6.2 Detail the Pin Number
-
7.9.6.3 Show Loomis Crew how to Set and Unset the Alarm Panel
-
7.9.6.4 Confirm Alarm Details Passed Over
-
7.9.7 ISD Code to be Handed Over?
-
7.9.7.1 Detail the 4 Digit Cash Code Handed Over
-
7.9.8 Confirm that ATM#1 is ready to hand over, Door Open/Cencon Locked/ISD (if Fitted) Closed
-
7.9.8.1 Detail what is diffrent/wrong?
ATM#1 Sign Off
-
7.9.10 Any Loomis Comments ?
-
7.9.11 Site, Keys and ATM accepted ?
-
7.9.12 Loomis - Type Name & Sign:
-
7.9.14 Any NCR Comments
-
7.9.15 NCR - Type Name & Sign:
-
7.9.16 ATM#1 Accepted ?
-=- Loomis can Now Re-Cash ATM#1 -=-
NCR Engineer Should Start on Next Section or Add another ATM
-
If Further ATM's Use Add:
Extra ATM
-
7.10 Does the ATM have Inner Safe Doors?
-
7.10.1 Is there a Battery Low Error?
-
7.10.1.1 Have the Batteries been replaced?
-
7.10.2 Confirm new G1 ISD keys applied as per EMDF:
-
7.10.2.1 What Issue stopped the G1 ISG Code being applied?
-
7.10.2.2 Confirm Region Key Code Used?
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 38
- 39
- 40
- 41
- 43
- 44
- 45
- 47
- Other
-
7.10.2.3 While was "Other" selected ?
-
7.10.3 Confirm new G2 ISD codes applied as per EMDF:
-
7.10.3.1 Confirm Cash Code Used?
-
7.10.3.2 What Issue stopped the G2 ISG Code being applied?
Cencon Lock Started
-
7.13 NEW Cencon Serial #?
-
7.14 Replace Cencon Lock Now
-
7.15 OLD Cencon Serial #?
-
7.16 Call AMC for Open & Close codes: Quote "TB Migration Project"
-
7.17 Open and Close Test Successful?
-
7.17.1 Detail Issue
-
7.17.2 Replace with the "spare" Lock back if Necessary
-
7.17.3 Spare Lock Used?
-
7.17.4 Serial No of New Lock?
-
7.17.5 Final Test Successful?
-
7.17.5.1 Place NCR security label on door and confirm completed
-
7.17.5.1 Detail why the label was not applied?
-
7.18 Confirm that the ATM is ready to hand over, Door Open/Cencon Locked/ISD (if Fitted) Closed
-=- Loomis can Now Re-Cash the ATM -=-
NCR Engineer Should Start on Next Section or Add another ATM
08.Final Site Migration
8.1 Phone Checks
-
8.2 Confirm Mobile Phone Signal
-
8.3 Confirm Land line present in ATM room
-
8.3.1 Is the Landline working
8.9 NCR to Loomis Sign Off
-
8.10 Number of Ex-G4S Cencon Lock Back Count Handed Over<br>Note - NO KNOWN FAULTY Lock Backs to be handed over to Loomis
-
8.11 Number of Faulty Cencon Locks from Site Held by NCR Engineer
-
8.12 Did Loomis hand over any Cencon Locks for Migration Use ?
-
8.12.1 Number of NEW Cencon Locks received from Loomis 0-99
-
8.13 Loomis Issues/Exceptions/Comments:
-
8.14 Loomis - Type Name & Sign:
-
8.15 Engineer Issues/Exceptions/Comments:
-
8.16 NCR - Type Name & Sign:
8.4 Blue Box - Or Local Access
-
8.5 Should the Site have a Blue Box
-
8.6 Does the Site actually have a Blue Box?
-
8.6.1 Is there any Sets of Engineering Keys?
8.6.2 NOTE - Migration Engineer Should Take ALL Engineering Keys Offsite
-
8.6.3 Detail Key Set Numbers and Key Quantities (Including Fobs)
8.6.4 NOTE - NO KEYS FOR ENGINEERING ACCESS
8.6.5 Engineer MUST escalate to Control
-
8.6.6 Phone Call to Control Time?
-
8.6.7 Control Agent Name
-
8.6.8 Detail Comments/Guidance from Control
-
8.6.9 Is the Location the same as the EMDF
-
8.6.9.1 Detail the Location
8.7 Blue Box Contents
-
8.7.1 Reference Code for Engineering Key Set?
-
8.7.2 Key/Fob Count?
-
8.7.3 Is the Key/Fob Count the same as the EMDF
-
8.7.3.1 Provide Exception Details:
Engineer should now Reprogram the Blue Box
-
8.8 Blue Box Reprogram Successful?
-
8.8.1 Confirm New Number?
-
8.8.2 Provide Exception Details?
Engineer Final Step
-
Final Completion Time
-
Any Final Comments to Add?