Information

  • Migration Reference (Auto Don't Change)

  • Engineer Quicklook id ?

  • Store Name ?

  • Store Number ?

  • Date of Migration

07.NCR Migration Activity

  • Need to add Alarm Fob Refernce details section
    Change ISD to Gryphon doors
    Need to look at Blue Box contenst section for multiple key sets

ATM #1 Migration

  • 7.1 Does the ATM have Inner Safe Doors ?

  • 7.1.1 Does the G1 have a Battery Low Error?

  • 7.1.1.1 Have the Batteries been Replaced ?

  • 7.1.2 Confirm new G1 ISD keys applied as per EMDF

  • 7.1.2.1 What Issue stopped the G1 ISG Code being applied:

  • 7.1.2.2 Confirm Region Key Code Used

  • 7.1.2.3 While was "Other" selected ?

  • 7.1.3 Confirm new G2 ISD keys applied as per EMDF

  • 7.1.3.2 Confirm Cash Code Used

  • 7.1.3.3 Confirm Engineer Code Used

  • 7.1.3.1 What Issue stopped the G2 ISG Code being applied:

ATM#1 Cencon Lock Start

  • 7.2 Note NEW Cencon Serial #?

  • 7.3 Replace Cencon Lock Now

  • 7.4 OLD Cencon Serial #?

  • 7.5 Call AMC and request 6 Digit code to program Blue Box with, Use Store Number as the Reference:

  • 7.5.1 New Blue Box Code from AMC, To be used later ?

  • 7.6 Call AMC for Open & Close codes: Quote "TB Migration Project"

  • 7.6.1 Open and Close Test Successful?

  • 7.6.2 Detail Issue:

  • 7.6.3 Replace with the "spare" Lock back if Necessary

  • 7.6.4 Spare Lock Used?

  • 7.6.5 Serial No of New Lock

  • 7.6.6 Final Test Successful ?

  • 7.6.6.1 Place NCR security label on door and confirm completed

  • 7.6.6.2 Detail why the label was not applied?

  • 7.7 Time the 1st ATM was completed

First Handover to Loomis

  • 7.8 Have Loomis Arrived Onsite?

  • 7.8.1 Start Work on Next ATM, Hand Over when Loomis arrive
    Or if Single Site Escalate to Control

7.9.3 NCR to Loomis ATM#1 and Key Handover

  • 7.9.4 Hand Over Start?

  • 7.9.5 Keys to be Handed Over

  • 7.9.5.2 Key Count Including Alarm Fob

  • 7.9.5.1 Reference Code for Key Set handed Over?

  • 7.9.5.2 Reference Code for Alarm Fob handed Over?

  • 7.9.6 Alarm Pin code to Hand Over

  • 7.9.6.1 Does Panel have a Pin Number?

  • 7.9.6.2 Detail the Pin Number

  • 7.9.6.3 Show Loomis Crew how to Set and Unset the Alarm Panel

  • 7.9.6.4 Confirm Alarm Details Passed Over

  • 7.9.7 ISD Code to be Handed Over?

  • 7.9.7.1 Detail the 4 Digit Cash Code Handed Over

  • 7.9.8 Confirm that ATM#1 is ready to hand over, Door Open/Cencon Locked/ISD (if Fitted) Closed

  • 7.9.8.1 Detail what is diffrent/wrong?

ATM#1 Sign Off

  • 7.9.10 Any Loomis Comments ?

  • 7.9.11 Site, Keys and ATM accepted ?

  • 7.9.12 Loomis - Type Name & Sign:

  • 7.9.14 Any NCR Comments

  • 7.9.15 NCR - Type Name & Sign:

  • 7.9.16 ATM#1 Accepted ?

-=- Loomis can Now Re-Cash ATM#1 -=-

NCR Engineer Should Start on Next Section or Add another ATM

  • If Further ATM's Use Add:

  • Extra ATM
  • 7.10 Does the ATM have Inner Safe Doors?

  • 7.10.1 Is there a Battery Low Error?

  • 7.10.1.1 Have the Batteries been replaced?

  • 7.10.2 Confirm new G1 ISD keys applied as per EMDF:

  • 7.10.2.1 What Issue stopped the G1 ISG Code being applied?

  • 7.10.2.2 Confirm Region Key Code Used?

  • 7.10.2.3 While was "Other" selected ?

  • 7.10.3 Confirm new G2 ISD codes applied as per EMDF:

  • 7.10.3.1 Confirm Cash Code Used?

  • 7.10.3.2 What Issue stopped the G2 ISG Code being applied?

Cencon Lock Started

  • 7.13 NEW Cencon Serial #?

  • 7.14 Replace Cencon Lock Now

  • 7.15 OLD Cencon Serial #?

  • 7.16 Call AMC for Open & Close codes: Quote "TB Migration Project"

  • 7.17 Open and Close Test Successful?

  • 7.17.1 Detail Issue

  • 7.17.2 Replace with the "spare" Lock back if Necessary

  • 7.17.3 Spare Lock Used?

  • 7.17.4 Serial No of New Lock?

  • 7.17.5 Final Test Successful?

  • 7.17.5.1 Place NCR security label on door and confirm completed

  • 7.17.5.1 Detail why the label was not applied?

  • 7.18 Confirm that the ATM is ready to hand over, Door Open/Cencon Locked/ISD (if Fitted) Closed

-=- Loomis can Now Re-Cash the ATM -=-

NCR Engineer Should Start on Next Section or Add another ATM

08.Final Site Migration

8.1 Phone Checks

  • 8.2 Confirm Mobile Phone Signal

  • 8.3 Confirm Land line present in ATM room

  • 8.3.1 Is the Landline working

8.9 NCR to Loomis Sign Off

  • 8.10 Number of Ex-G4S Cencon Lock Back Count Handed Over<br>Note - NO KNOWN FAULTY Lock Backs to be handed over to Loomis

  • 8.11 Number of Faulty Cencon Locks from Site Held by NCR Engineer

  • 8.12 Did Loomis hand over any Cencon Locks for Migration Use ?

  • 8.12.1 Number of NEW Cencon Locks received from Loomis 0-99

  • 8.13 Loomis Issues/Exceptions/Comments:

  • 8.14 Loomis - Type Name & Sign:

  • 8.15 Engineer Issues/Exceptions/Comments:

  • 8.16 NCR - Type Name & Sign:

8.4 Blue Box - Or Local Access

  • 8.5 Should the Site have a Blue Box

  • 8.6 Does the Site actually have a Blue Box?

  • 8.6.1 Is there any Sets of Engineering Keys?

8.6.2 NOTE - Migration Engineer Should Take ALL Engineering Keys Offsite

  • 8.6.3 Detail Key Set Numbers and Key Quantities (Including Fobs)

8.6.4 NOTE - NO KEYS FOR ENGINEERING ACCESS

8.6.5 Engineer MUST escalate to Control

  • 8.6.6 Phone Call to Control Time?

  • 8.6.7 Control Agent Name

  • 8.6.8 Detail Comments/Guidance from Control

  • 8.6.9 Is the Location the same as the EMDF

  • 8.6.9.1 Detail the Location

8.7 Blue Box Contents

  • 8.7.1 Reference Code for Engineering Key Set?

  • 8.7.2 Key/Fob Count?

  • 8.7.3 Is the Key/Fob Count the same as the EMDF

  • 8.7.3.1 Provide Exception Details:

Engineer should now Reprogram the Blue Box

  • 8.8 Blue Box Reprogram Successful?

  • 8.8.1 Confirm New Number?

  • 8.8.2 Provide Exception Details?

Engineer Final Step

  • Final Completion Time

  • Any Final Comments to Add?

If NOT the Last Site of the Day Open a G4S-NCR Template and Make De-cash Start Phone Call to G4S

If it was the Last Site of the day, Well Done ;o)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.