Title Page
-
TBC_Checklist_Lifting of Pre Fab rebar
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Wall construction
-
Is the rebar wall tided every 4th bar with cross ties / A parede de ferro esta atada a cada 4 barras
-
Are the starter bars on top securely fastened / Os ferros de arranque na parte de cima estão seguros
-
Are the corners secured with cross ties / Os cantos estao seguramente atados com pontos cruzados
-
Is there any free bar in the wall (not tied) / Tem barras soltas na parede
-
Is the rebar structure stable / A parede esta estavel
Wall lifting points
-
Is the straps laced to the 4th sidebare from the top down / As cintas estao amarradas a 4 barra lateral de cima para baixo
-
Is the sidebar from the lifting point tied with cross wire minimum 1 metre out / A barra lateral so ponto de elevacao esta atada no minimo de 1 metro para fora
-
After lifting 30cm from the floor do the pre fab wall look stable and with no loose ends / Depois de levantar 30cm do chao. a parede prefab parece estavel e sem pontas soltas
-
If the walls longer then 4,00m, need lifting beam? / Se a parede for maior que 4,00m de comprimento precisa de balança?
-
Are the right straps certificated for the lift / As cintas são certificadas para o içamento?
-
Signature