Information
-
Audit location
-
Add media
-
Date of inspection -
-
Location of the Audit:
-
Prepared by
-
Location
-
Personnel
1.0 - Initial Comment?
-
1.1 - Are additional comments applicable?
2.0. Site Trailer Audit Inspection (monthly frequency).
-
Is this applicable or not applicable?
-
2.1 - Has the last site inspection been reviewed?
Completed by: Date of completion:
-
2.2 - Is the Safety board mounted? (Reg. 1101 1 (1) (b))
Completed by: Date of completion:
-
2.3. - Is the WSIB - 1234 poster posted? (Form 82) As per (Reg. 1101 1 (1) (b) (I))
Completed by: Date of completion:
-
2.4 - Is the Occupational Health and Safety Act/Regulation (Green book) available? (OHS Act 25 (2) (I))
Completed by: Date of completion:
-
2.5. - Stretcher with 2 blankets mounted or available. (Reg. 1101 10 (1))
Completed by: Date of completion:
-
2.6 - Emergency response plan poster posted and rescue procedure available? (OHS. Reg. 17 (1) and 17 (3))
Completed by: Date of completion:
-
2.7 - Eye wash station or eye wash capabilities on site? (OHSA 27 (2) c. - referring to "every precaution reasonable . . . . ")
Completed by: Date of completion:
-
2.8 - Materials safety data sheets? (OHS Reg. 37 (1) (b) and Reg.38 (1) (a))
Completed by: Date of completion:
-
2.9 - TACC procedure manual? (OHS 26 (k))
Completed by: Date of completion:
-
2.10 - Hospital map with directions to nearest local hospital?
Completed by: Date of completion:
-
2.11 - Clinic map or directions posted?
Completed by: Date of completion:
-
2.12 - TACC safety program posted?
Completed by: Date of completion:
-
2.13 - Are emergency contact numbers posted?
Completed by: Date of completion:
-
2.14 - Are Health and Safety committee member's name and contact numbers posted or available? (OHS Act 9 (32))
Completed by: Date of completion:
-
2.15 - Is the Fire extinguisher mounted and appearing to be in functional use? (O. Reg. 213/91 s. 52 (1)).
Completed by: Date of completion:
-
2.16 - Does the Fire Extinguisher have the attached inspection card and is it up date with monthly inspections? (O. Reg. 219/91 S. 55).
Completed by: Date of completion:
-
2.17 - Is TACC's safety policy and Violence and Harassment commitment statement posted? (OHS 32.0.1 (2))
Completed by: Date of completion:
-
2.18 - Is the trailer in a reasonable state of cleanliness? (O. Reg. 213/91 s. 35 (1)).
Completed by: Date of completion:
-
2.19. - Is a First Aid kit present? (Regulation 1101 8(1), 9(1), 10(1)
Completed by: Date of completion:
-
2.20. - Is the First Aid kit's content inspections up to date? (Completed quarterly - 4X's a year). Regulation 1101 5.
Completed by: Date of completion:
-
2.21. - Is Regulation 1101 (First Aid Requirements) posted?
Completed by: Date of completion:
-
2.22. - Are the valid First Aid certificates of qualification of trained workers on duty posted or available on site? (Regulation 1101 - 1(1)b(I))
Completed by: Date of completion:
-
2.23 - Is a copy of the TACC's Confined Spaces program posted or available? (OHS Reg 221.5 (5))
Completed by: Date of completion:
-
2.24. - Is the notice of project posted? (OHS Act 23 (2))
Completed by: Date of completion:
-
2.25. - Is TACC's Health and Safety policy posted or available as per OHS Act 25 (2) (j).
Completed by: Date of completion:
-
2.26 - Is the "Employment Standards in Ontario" notice on ESA 2000 posted?
Completed by: Date of completion:
-
2.27 - Is the "Health and Safety at work - Prevention Starts Here" poster?
Completed by: Date of completion:
-
2.28 - Are necessary locates on site as required (if needed)? (O. Reg. 213/91 228 (1)).
Completed by: Date of completion:
-
2.29 - Is drinking water in the trailer or available on site? (O Reg. 213/91 s. 28 (1)).
Completed by: Date of completion:
-
2.30 - If required, are trench box / slide rail support system engineered drawings posted or available and on-site? (O. Reg. 213/91 236 (7)).
Completed by: Date of completion:
-
2.31. - Are Safety Tool Box talks posted? (OHSA 27 (2) a)
Completed by: Date of completion:
-
2.32. - If there is a portable toilet at the trailer, is appear properly maintained? (O. Reg. 29)
Completed by: Date of completion:
-
2.33. - Is the parking area for the trailer and its entrance appear properly maintained?
Completed by: Date of completion:
-
2.34. - Are workplace inspections posted on site? (O. Reg. 213/91, s 19)
Completed by: Date of completion:
-
2.35 - If required are Traffic Control Plans posted or on the project to be ". . . made available to an inspector or a worker on request."? ? (O. Reg. 213/91, 67 (5) (b)).
Completed by: Date of completion:
-
2.36 - Is Site specific JHA (job Hazard Analysis) posted on site?
Completed by: Date of completion:
-
2.37 - Is the training matrix available on site to verify a worker's training and or competence?
Completed by: Date of completion:
-
2.38 - Is the Workplace Violence and Harassment assessment posted and recent within one month? OHSA 32.0.3 (1) and Act 55.1
Completed by: Date of completion:
-
2.39 - Is the Lock Out and Tag out kit stocked and on site? (O. Reg. 213/91, 67 (5) (b)).
Completed by: Date of completion:
-
2.40 - Is a spill kit on site either in the trailer or with the Earthworks crew? (O. Reg. 213/91, 67 (5) (b)).
Completed by: Date of completion:
-
2.41 - As required, are "Working near overhead power lines" documents posted ? (O. Reg. 213/91, 67 (5) (b)).
Completed by: Date of completion:
-
2.42. - Are MOL notices posted (if any have been received)? O. Reg. S. 57(9), 57(10)a
Completed by: Date of completion:
3.0. Workplace audit.
-
Is this applicable or not applicable?
3.1. - Site Work:
-
3.1.1 Trench excavation - Is the trench acceptably sloped?
Completed by: Date of completion:
-
3.1.2. - Is the trench excavation acceptably dry?
Completed by: Date of completion:
-
3.1.3. - Is the trench box installed to the engineered and regulatory spec?
Completed by: Date of completion:
-
3.1.4. - Is the housekeeping on site acceptably clean?
Completed by: Date of completion:
-
3.1.5. - Are Confined Spaces identified and proper protocol being followed?
3.2. - Working near underground utilities:
-
3.2.1. - Are locates current for gas, hydro, bell, cable, municipal services . . . . .?
Completed by: Date of completion:
Completed by: Date of completion:
-
3.2.2. - Are locates readily available to workers that need to refer to them?
Completed by: Date of completion:
-
3.2.3. - Are these utilities hand dug to identify before excavating with an excavator ?
Completed by: Date of completion:
3.3. - Working near overhead Power Lines?
-
3.3.1. - Have workers received on site training to work near overhead power lines?
Completed by: Date of completion:
-
3.3.2. - Is overhead warning signage in place?
Completed by: Date of completion:
-
3.3.3. - Is a "spotter" trained and being utilized as required?
Completed by: Date of completion:
-
3.3.4. - Are truck overhead wire warning signage being utilized as needed?
Completed by: Date of completion:
3.4. - Work tools:
-
3.4.1. - Rigging inspected and documented as required? O. Reg. 217/91 170 (re:crane)
Completed by: Date of completion:
-
3.4.2. - Are ladders appropriately maintained (with feet, without damaged sides or rungs) ? O reg. 213/91 s. 78
Completed by: Date of completion:
-
3.4.3. - Is the ladder secured? O. Reg. 213/91 !!!!!!!!!!!!!
Completed by: Date of completion:
-
3.4.4. Is the ladder not being used as a work place platform"? O. Reg. 107 !!!!!!!!!!!!
Completed by: Date of completion:
3.5. - Work practises:
-
3.5.1 - Is proper PPE being used by all on site workers? Reg. Reg. 21 - 25.!!!!!!!!
Completed by: Date of completion:
-
3.5.2. - Is specialized PPE available and being used as required?
Completed by: Date of completion:
-
3.5.3. - Are workers always clear of overhead loads? O. Reg. 103 !!!!!!!!!!!!!
Completed by: Date of completion:
-
3.5.4. - Is lock out / tag out being used to take out of usage any broken equipment or tools? O. Reg. 190.
Completed by: Date of completion:
-
3.5.5 - Are spotters being used for reversing vehicles that are near workers or workplace areas? O. Reg. 106 and Reg. 188(8) !!!!!!!!!!
Completed by: Date of completion:
-
3.5.6. - Are spotters trained to be spotters?
Completed by: Date of completion:
-
3.5.7. - Is the reversing of vehicles on site being kept to a reasonable minimum?
Completed by: Date of completion:
-
3.5.8. Are MSDS sheets accurately representing any WHMIS identified products?
Completed by: Date of completion:
-
3.5.9. - Is proper WHMIS labelling being used for on site working containers?
Completed by: Date of completion:
-
3.5.10. - Are any extreme temperatures or rain conditions being properly monitored for appropriate response?
Completed by: Date of completion:
-
3.5.11. - Do workers have access to drinking water? O. Reg. 28 !!!!!!!!!
Completed by: Date of completion:
-
3.5.12. - Does the site appear free from any instances of Workplace Violence and Harassment?
Completed by: Date of completion:
3.6. - Equipment meeting regulatory requirements.
-
3.6.1. - Is emergency equipment available within minutes should it be needed in the workplace?
Completed by: Date of completion:
-
3.6.2. - Are toilet facilities near to workers and appear in reasonable care? O. Reg. 29. !!!!!!!!
Completed by: Date of completion:
-
3.6.3. - If being used are both tripod and harness been inspected and in acceptable repair?
Completed by: Date of completion:
-
3.6.4. - Are air monitor(s) available if required? O. Reg. 221 !!!!!!!!
Completed by: Date of completion:
-
3.6.5. - Is a fire extinguisher near cutting work when the cutting is done with a gas powered equipment? O. Reg. 52 (2) (b). !!!!!!!!!
Completed by: Date of completion:
-
3.6.6. - Is emergency equipment available within minutes should it be needed in the workplace?
Completed by: Date of completion:
3.7. - Public and vehicular Safety:
-
3.7.1. - Is the site entrance well marked with construction signage? ( as needed).
Completed by: Date of completion:
-
3.7.2 . - re traffic control plan
Completed by: Date of completion:
-
3.7.3. - re: jersey barrier/ protection of workers from the hazard of vehicles.
Completed by: Date of completion:
-
3.7.4. - Is the excavation or site secure after hours.
Completed by: Date of completion:
-
3.7.5. - Re parking away from work area.
Completed by: Date of completion:
-
3.7.6. - re public right of ways maintained and properly segregated.
Completed by: Date of completion:
3.8. - Environmental Response:
-
3.8.1. - re spill control capabilities
Completed by: Date of completion:
-
3.8.2. - re silt fence as needed.
Completed by: Date of completion:
-
3.8.3 - re dust control appropriate.
Completed by: Date of completion:
-
3.8.4. - re noise at reasonable level.
Completed by: Date of completion:
4.0. Additional comments or concerns.
-
4.1. - Are additional comments applicable?
Completed by: Date of completion:
5.0. Sign Off
-
On site representative
-
Auditor's signature.