Title Page
-
Contractor:
-
Department:
-
Audit Date:
-
Inspector Name:
-
Location:
-
INSTRUCTIONS
------------------------
1. Please answer "Yes," "No," or "N/A" on the questions below.
2. Add photos and notes by clicking on the paperclip icon
3. To add a Corrective Action click on the paperclip icon then "Add Action," provide a description, assign to a member, set priority, and due date
4. Complete audit by providing digital signature
5. Share your report by exporting as PDF, Word, Excel or Web Link
1. Section C - Major
-
1. Reviewed by workers, signed (TCSR)
-
2. Follows Work: Applicable
-
3. Updated: being followed
-
4. Hot Work Requirements Met: issued
-
5. 100% tie off in use
-
6. Leading Edges: Identified, protected
-
7. Floor openings: permit issued, followed
-
8. Excavation over 5ft; sloped, benched, shored
-
9. Energy Sources: Identified, isolated, locked out
-
10. Crane Operator Certified: Card checked
-
11. Confined space air quality tested
-
Are all questions above compliant?
-
12. Additional Comments for this section:
-
Add media
2. Section C1 - JSA.
-
1. Posted, easy access
-
2. Required documents on control board
-
3. Additional Comments for this section:
-
Add media
3. Section D - Environment / Site Conditions.
-
1. First Aid Kit: Stocked, Eye Wash, Accessible
-
2. Sanitation: Toilets clean, stocked (portables)
-
3. Noise: Below 85dba, protection used
-
4. Lighting: General, Task
-
5. Ventilation: Heat, Odors
-
6. Dust Control
-
7. Additional Comments for this section:
-
Add media
4. Section E - Personal Protective Equipment.
-
1. Stand: Hard hat, glasses, high vis clothing, boots
-
2. Other: Correct for area, task, department
-
3. Additional Comments for this section:
5. Section F - Fire Protection.
-
1. Extinguishers: Sized for task, inspected
-
2. Flammable Liquids: Controlled, stored properly
-
3. Additional Comments for this section:
-
Add media
6. Section G - Signs, Barricades.
-
1. Proper Barricades: Placement
-
2. Signs: Correct, posted, phone number, red, yellow
-
3. Additional Comments for this section:
-
Add media
7. Section H - Materials / Handling / Storage / SS.
-
1. Mat, Tools, Equipment: Stored properly, neatly stacked
-
2. Trip Hazards: Cords neatly run, areas clean
-
3. Liquids on floor: spill kit available
-
4. Rigging for mat handling correct, stored properly
-
5. Additional Comments for this section:
-
Add media
8. Section I - Tools: Hand and Power.
-
1. Condition: Handles on, cord not cut
-
2. Guarding: Used, adjusted correctly
-
3. Proper Usage: Correct tool for the job
-
4. Identification on gang boxes, tools, equipment
-
5. Additional Comments for this section:
-
Add media
9. Section J - Welding, Cutting, and Grinding.
-
1. Proper PPE: Non-flammable clothing
-
2. Shields, Barriers: Equipment, area protected
-
3. Gas Equipment: Proper storage, flash arrestors used
-
4. Additional Comments for this section:
-
Add media
10. Section K - Electrical.
-
1. GFCI Protection: tested
-
2. Extension Cords: Condition, Protected, Inspected
-
3. Additional Comments for this section:
-
Add media
11. Section L - Scaffolds.
-
1. No missing planking, bracing, guardrails
-
2. Inspected: Tagged, hazards noted
-
3. Falling Object Protection: Toe boards
-
4. Rolling Scaffolds: Wheels locked
-
5. Basket: Floor cleaned, materials loaded properly
-
6. Additional Comments for this section:
-
Add media
12. Section M - Fall Protection.
-
1. PFRS: Inspected, good condition, worn properly
-
2. Proper Anchorage: Clamps, Straps, Lines
-
3. Workers tied off in scissor lifts
-
4. Warning Lines: Used, proper distance
-
5. Roof work: Permitted, weather conditions
-
6. Additional Comments for this section:
-
Add media
13. Section O - Motor Vehicles / Mechanized Equipment.
-
1. Daily inspections, equipment identified
-
2. Safety Devices: Seat belts, lights, alarm
-
3. Operators: Certified, authorized, licensed
-
4. Forklift operated correctly
-
5. Additional Comments for this section:
-
Add media
14. Section P - Excavations.
-
1. Over 4 ft: Ladder access, every 25 ft.
-
2. Spoils: Back 3 ft.
-
3. Water Intrusion: Rain, seepage
-
4. Excavation Protected: Equipment, workers
-
5. Additional Comments for this section:
-
Add media
15. Section Q - Concrete and Masonry Construction.
-
1. Rebar / rods capped, protected
-
2. Masonry walls supported, limited access zone
-
3. Additional Comments for this section:
-
Add media
16. Section R - Steel Erection, Equipment Placement.
-
1. Area protected from overhead lifts
-
2. Site specific erection plan in place
-
3. Area will support equipment and load
-
4. Additional Comments for this section:
-
Add media
17. Section T - Demolition.
-
1. Engineer survey by Competent Person made
-
2. All Serv: Shut off, capped, disc, removed
-
3. Additional Comments for this section:
-
Add media
18. Section V - Power Transmission / Distribution / LO.
-
1. Sign In/Out Sheet: Used and correct
-
2. Group LO: Key box used / key inside
-
3. Locks: Labeled, contain required information
-
4. Arc Flash: Proper PPE, workers trained
-
5. Additional Comments for this section:
-
Add media
19. Section X - Ladders.
-
1. Secured: Used properly, right type for work
-
2. Non-Conductive: No metal side rails
-
3. Good Condition: rungs, rails, bracing
-
4. Additional Comments for this section:
-
Add media
20. Section Z - Toxic / Hazardous Substances.
-
1. Chemicals: Identified, labeled
-
2. Stored Properly: Correct containment
-
3. SDS Sheets: Available, correct
-
4. Proper PPE being used
-
5. Additional Comments for this section:
-
Add media
21. Section CC - Cranes and Derricks.
-
1. Crane Inspection: Certifications current
-
2. Rigging: Condition, inspected, rating tag
-
3. Rigger Qualified: Checked
-
4. Signal Person: Qualified, checked
-
5. Additional Comments for this section:
-
Add media
22. Section A1 - Confined Space.
-
1. Permit / Checklist Posted
-
2. Workers Trained / Rescue notified
-
3. Additional Comments for this section:
-
Add media
Signatory
-
Inspector Name and Signature:
-
Main Contractor Rep Name and Signature:
-
Main Contractor Safety Rep Name and Signature
-
Participant Name and Signature