Title Page

  • Site conducted

  • Conducted on

  • Location

Untitled Page

Wet plant areas

  • LTHW pressurisation unit pressure

  • Cold water booster set checks

  • Chilled water pressurisation unit pressure

  • Air handling units 4-5-6-7-10 Operation

  • Constant temperature pumps 1-2-3-4-5-6 operation

  • Variable Temperature pumps 7-8 operation

  • chiller pumps 1-2 operation

CHP Unit

  • Oil level checks

  • Total power generation (KWH)

  • Total run hours

Chlorine dioxide unit

  • Check operation of chlorine dioxide unit

  • Wetside chlorine dioxide unit

  • Dryside chlorine dioxide unit

Dry plant areas

  • Air handling units 1-2-3-9-11 Operation

  • Ground floor toilet extract operation

  • First floor toilet extract operation

  • Cold water booster set checks

Boiler Temperatures

  • Boiler 1 Temperature

  • Boiler 2 Temperature

  • Boiler 3 Temperature

  • Boiler 4 Temperature

Daily Water Temperature Checks

  • Wetside Calorifier Number 1

  • Wetside Calorifier number 2

  • Dryside Calorifier number 1

  • Dryside Calorifier number 2

  • Wetside cold water storage temperature

  • Dryside cold water storage temperature

  • Mains water temperature from plantroom checks

Reactive works

  • Check the CAL for reactive works

  • Check the BMS for faults and rectify

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.