Title Page

  • Date of Inspection

  • Inspector(s)

  • Site Name

  • Site Manager

  • Site Address

  • Email/ Website

  • Location

Documentation

  • Ropes course construction company

  • Date of construction

  • Date of construction

  • Inaugural inspection (Type A)

  • Plans available

  • Calculations available

  • Arborist report available

  • Construction/ installation certificates available

  • Periodical inspection paperwork available

  • Annual Arborist report available

  • Visual or operational inspection paperwork available

  • Visual or operational inspection paperwork completed

  • PPE management check

  • Operational procedures or manual check

  • Copies of paperwork taken

  • Inspection standards

Site plan

  • Site plan

  • Site plan photo

Element

  • Steel frame condition

  • Pole condition

  • Wire condition

  • Guy wires condition

  • Fixings condition

  • SRB condition

  • Trolley condition

  • Connectors

  • Instructor access

  • Safety system

  • Ground surface condition

  • Sub-elements

  • Additional information

  • Pictures taken

  • Conclusion

  • Certification

Statement and signature

  • Stu Wilkes

  • Any person that works on the ropes course should be trained and insured to do. This inspection report may only be reproduced in full as per the requirements of EN 15567. All inspection reports should be included in the operational documentation of the ropes course

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.