1. Fall Protection (OSHA Subpart "M")
-
1.1. All employees trained in fall protection?
-
1.2. Lack of leading edge protection?
-
1.3. Unsafe or incomplete edge protection?
-
1.4. All body harness, lanyard and SRL been inspected?
-
1.5. Are all anchor points rated at least 5,000 pounds?
-
1.6. Are all body harnesses fitted properly?
2. Ladders (OSHA Subpart "X")
-
2.1. All employees trained in ladder safety?
-
2.2. Any unsafe or damaged ladders on the project?
-
2.3. Any unsafe positioning of a ladder?
-
2.4. Extension ladder tied off at top of ladder?
-
2.5. Is there 3' of the extension ladder extended above the next elevation?
-
2.6. Ladder being used on level ground?
-
2.7. Are all labels on ladders?
-
2.8. All ladders been inspected?
3. PPE (OSHA Subpart "E")
-
3.1. All employees wearing hard hats, safety glasses, vests and gloves?
-
3.2. Hearing protection being worn when needed?
-
3.3. Are there face shields, goggles on site and being worn when performing overhead work?
-
3.4. Any PPE needed to be ordered?
4. Confined Space (OSHA Subpart "AA")
-
4.1. All employees trained in confined space awareness?
-
4.2. Has a confined space permit been completed?
-
4.3. Is there a trained confined space competent person on site?
-
4.4. Is there an air quality monitor on site?
-
4.5. Is there a tri pod, wench, body harness and blower on site per confined space?
-
4.6. Is there an emergency rescue person at each confined space?
-
4.7. Is there an E.A.P. developed and understood by all personnel?
-
4.8. Has there been a JHA developed for the work explaining the risk?
-
4.9. Are there any known hazards in the confined space?
5. Hazard Communication (OSHA Subpart "Z")
-
5.1. All employees been trained in Haz-com?
-
5.2. Is there a MSDS binder on site?
-
5.3. Do employees know what Haz-com means and where the Haz-com manual is?
-
5.4. If we have chemicals on site is there a spill kit on site?
-
5.5. Right PPE on site to deal with a chemical spill (chemical gloves,goggles)?
-
5.6. Any unsafe storage of chemicals?
-
5.7. Are all chemicals in labeled containers?
7. Housekeeping (OSHA Subpart "C")
-
7.1. General appearance of project (all trades)?
-
7.2. Are passageways and walkways clear of trash and debris (Jetline)?
-
7.3. Any protruding nails in scrap lumber laying around?
-
7.4. Is there fresh water on site (cups,trash can, tape around lid with date)?
-
7.5. Are the FSG conex's clean and orderly?
-
7.6. Is all FSG stored materials neatly stacked and orderly?
-
7.7. Is all of FSG's trash picked up off of the floor and site?
-
7.8. Are all FSG materials at a minimum of 15' from all leading edges?
8. Signs and Barricades (OSHA Subpart "G")
-
8.1. Holes 2" and larger in floors covered and marked?
-
8.2. All leading edge guard rails up and secure?
-
8.3. Correct use of caution or danger signs / tape in place?
-
8.4. Hazard warning signage posted as needed?
-
8.5. Traffic cones or barricades in place if needed?
-
8.6. All hazard signage in place? Temp panels, laser in use,etc?
-
-
8.7. Sufficient ventilation?
9. Electrical Safety (OSHA Subpart "K")
-
9.1. Do all extension cords have the ground prong and in good condition?
-
9.2. If the job site is using the assured grounding program, have all extension cords been inspected and labeled with the correct color for the month?
-
Was there any Safety Violations found?