Information

Report Details

  • TELSTRA SITE NAME

  • TELSTRA SITE NUMBER

  • SITE LOCATION
  • STATE

  • INSPECTORS NAME

  • INSPECTION DATE

Access

  • Site Access checked and verified

  • For rural sites access route noted

  • Access photos taken

  • Construction vehicle access feasibility checked

  • EWP parking area noted

  • Access restriction noted- After hour build, bridge load limits etc.

  • LAD-SAF certificate checked and TAG photo taken

  • Photo taken of access to roof level

Planning and Property

  • Panoramic photos – no people should be in photos

  • Photo of site area from the nearest road – enough space for photo montage of pole

  • Photo of site area from access point (proposed or existing)

  • Determine if schools, child care, church or local park/play ground is nearby. Not distances and take photos of both the area and the area looking toward the facility

  • Does proposed equipment fit within lease area, if not mark up additional required area

Design- pole or tower site

  • Locate pole/tower I.D tag captured

  • Height of pole/tower using range finder

  • Height of Headframe / Mounts

  • Structure type (e.g. Concrete, Steel) verified

  • Pole circumference/diameter measured

  • Footing dimensions measured if possible

  • Base plate thickness measured if possible

  • Lease area checked (existing vs proposed)

  • Possible obstructions noted

  • EWP parking area noted

  • Photos taken of Existing Headframe / mounts

  • Photos taken of other carriers Existing equipment

Design- Cable tray/feeder run details

  • Width and depth of existing cable tray captured

  • Cable run length measured (existing) mark on plan

  • Existing feeder number and sizes noted

  • Provision for new cables checked

  • New antennas/RRUs/other ancillaries captured

RF and EME information

  • NFPOI information obtained and verified

  • Information of existing access point and access control (e.g. chain barrier& signage) obtained and verified

  • Existing building/structure height checked

  • Information of third party antennas identified and obtained

  • Existing bearing of Sector 1 correct

  • Existing bearing of Sector 2 correct

  • Existing bearing of Sector 3 correct

  • Photos taken from 0 deg to 360 deg at 30 deg intervals

Shelter/ODU

  • Floor layout sketch verified and cheched

  • Access clearence checked in front of rack (min. 600mm)

  • Rack layout verified in detailed including TU and RFU information

  • Shelter model type and size checked

Electrical

  • Inside shelter/ODU/OTC photos taken covering all BTS racks

  • Clear photos of all racks with showing installed equipment inside taken

  • Photos showing clear breaker size and spare breakers

  • Photos of internal A/C system covering model,cooling capacity, spec label etc

  • DC Power system unit (Eltek/Huawei) photos taken covering number of rectifiers & Battery strings

  • Closeup photo of Rectifier taken showing the size of rectifier

  • Photos of Internal Distribution Board taken: (External and Internal Circuit Breakers with legend)

  • Photos of all earth bars(SEB/SPC/FEB) taken and location marked on drawings

  • Surge Reducton Filter (SRF) installed on site

  • Clear photo of galnd window taken

  • Clear photos of AC Power meter panel internal/external taken

  • Photo taken of any sketches

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.