Information
Report Details
-
TELSTRA SITE NAME
-
TELSTRA SITE NUMBER
-
SITE LOCATION
-
STATE
- QLD
- NSW
- VIC
- TAS
- SA
- WA
- NT
-
INSPECTORS NAME
-
INSPECTION DATE
Access
-
Site Access checked and verified
-
For rural sites access route noted
-
Access photos taken
-
Construction vehicle access feasibility checked
-
EWP parking area noted
-
Access restriction noted- After hour build, bridge load limits etc.
-
LAD-SAF certificate checked and TAG photo taken
-
Photo taken of access to roof level
Planning and Property
-
Panoramic photos – no people should be in photos
-
Photo of site area from the nearest road – enough space for photo montage of pole
-
Photo of site area from access point (proposed or existing)
-
Determine if schools, child care, church or local park/play ground is nearby. Not distances and take photos of both the area and the area looking toward the facility
-
Does proposed equipment fit within lease area, if not mark up additional required area
Design- pole or tower site
-
Locate pole/tower I.D tag captured
-
Height of pole/tower using range finder
-
Height of Headframe / Mounts
-
Structure type (e.g. Concrete, Steel) verified
-
Pole circumference/diameter measured
-
Footing dimensions measured if possible
-
Base plate thickness measured if possible
-
Lease area checked (existing vs proposed)
-
Possible obstructions noted
-
EWP parking area noted
-
Photos taken of Existing Headframe / mounts
-
Photos taken of other carriers Existing equipment
-
Photo taken of any sketches
Design- Cable tray/feeder run details
-
Width and depth of existing cable tray captured
-
Check if cable ladder covers are fixed with J-bolts
-
Cable run length measured (existing) mark on plan
-
Cable run length measured (proposed) mark on plan
-
Existing feeder number and sizes noted
-
Photos of cable tray covers/fixing method captured
-
Provision for new cables checked
-
New antennas/RRUs/other ancillaries captured & mark on plan
-
Width/depth/arrangment of the cable ladder on pole/tower captured.
-
Photo taken of any sketches
RF and EME information
-
NFPOI information obtained and verified
-
Information of existing access point and access control (e.g. chain barrier& signage) obtained and verified
-
Existing building/structure height recorded
-
Existing antenna height, bearing & M-tilt checked and recorded on site
-
Information of third party antennas identified and obtained
-
Photos taken in bearing direction of Existing Sector 1
-
Photos taken in bearing direction of Existing Sector 2
-
Photos taken in bearing direction of Existing Sector 3
-
Photos taken from 0 deg to 360 deg at 30 deg intervals
Shelter/ODU
-
Floor layout sketch verified and rack location dimensions marked up on drawing (all distances in both directions)
-
Access clearence checked in front of rack (min. 600mm)
-
Rack layout verified in detailed including TU and RFU information
-
Internal cable tray layout verified and noted
-
Shelter model type and size captured
-
Shelter support details, i.e. roof structure/steel support structure including joists size and spacing
-
Photo taken of any sketches
Electrical
-
Inside shelter/ODU/OTC photos taken covering all BTS racks
-
Clear photos of all racks with showing installed equipment inside taken
-
Photos showing clear breaker size and spare breakers
-
Photos of internal A/C system covering model,cooling capacity, spec label etc
-
DC Power system unit (Eltek/Huawei) photos taken covering number of rectifiers & Battery strings
-
Closeup photo of Rectifier taken showing the size of rectifier
-
Photos of Internal Distribution Board taken: (External and Internal Circuit Breakers with legend)
-
Photos of all earth bars(SEB/SPC/FEB) taken and location marked on drawings
-
Surge Reducton Filter (SRF) installed on site
-
Clear photo of galnd window taken
-
Clear photos of AC Power meter panel internal/external taken
-
Photo taken of any sketches