Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
PRESSURE RELIEF VALVE.
-
Was there a Tempering Valve previously fitted to unit?
-
Has the new valve been fitted in the correct position?
-
Has the cover jacket been fitted and secured using 4 cable ties?
-
Has the Tempering Valve Installation Details Label Been Fiiled Out and Placed next to Valve?
-
Are the hot water lines correctly lagged with no splitting?
-
Have all lagging ends been taped?
-
Are all the fittings leak free?
-
What is the water temperature set at?, Check at tap.
-
COMMENTS.
-
Add signature