Title Page

  • Conducted on

  • Location
  • Prepared by

Instructions

  • Instructions:

    Perform Pre-Operational Checklist for BOTH cranes. CR-1 (S/N S10000904023) and CR-2 (S/N S10000904022)
    -------------------------------------

    1. Start the Inspection by selecting the appropriate crane that is going to be inspected and rate each item as "Compliant", "Non- Compliant"
    2. Add photos and notes by clicking on the paperclip icon. (If needed for document purposes)
    3. If applicable, add comments at the end of each section with any corrective measures, requests, suggestions, etc.
    4. Share your report by exporting as PDF.

    Note: Please report any unusual findings or non-compliant findings to your manager and HSE contact.

Crane 1

Crane Inspections

  • Select Crane to be inspected.

Visual and Operational Inspection

  • Check controller pendant chain

  • Inspect hook/s

  • Inspect wire rope for kinks, broken strands, wear, etc

  • Check controls on controller

  • Check to see if wire rope is in drum grooves

  • Verify that upper limit switch functions (**This crane does not have a lower limit switch**)

  • Check hoist motion UP

  • Check hoist motion DOWN

  • Check hoist/holding brake

  • Test motion NORTH

  • Test motion SOUTH

  • Test motion EAST

  • Test motion WEST

  • Check bridge brake (**This crane does not have brakes for NORTH/SOUTH**)

  • Check for proper festoon cable/trolley function. (electrical cable)

  • Comments, suggestions, requests, corrective measures, etc

Crane 2

  • Select Crane to be inspected.

Visual and Operational Inspection

  • Check controller pendant chain

  • Inspect hook/s

  • Inspect wire rope for kinks, broken strands, wear, etc

  • Check controls on controller

  • Check to see if wire rope is in drum grooves

  • Verify that upper limit switch functions (**This crane does not have a lower limit switch**)

  • Check hoist motion UP

  • Check hoist motion DOWN

  • Check hoist/holding brake

  • Test motion NORTH

  • Test motion SOUTH

  • Test motion EAST

  • Test motion WEST

  • Check bridge brake (**This crane does not have brakes for NORTH/SOUTH**)

  • Check for proper festoon cable/trolley function. (electrical cable)

  • Comments, suggestions, requests, corrective measures, etc

Signoff

  • Sign off (Employee)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.