Title Page
-
Site name
-
Site number
-
Project / MCAP number
-
Project type (Cap.R, Gen.M, BI, Engineering, etc.)
-
Scope of work (taken from the PCI)
-
Scope of the audit (provide a short summary of the audit scope)
-
Name of PD
-
Name of Tesco PPM
-
Name of the External Project Manager (EPM)
-
Has the PPM / EPM completed an H&S inspection?
-
Name of PC
-
Name of the Site / Construction Manager
-
Conducted on
-
Prepared by
Project Administration
-
Has LX been used for the transfer of information between the project team members?
-
Has the PD issued an Letter of Adequacy (LOA) for the work being completed?
-
Has the PC provided a copy of their CPP to the Site Manager / Supervisor?
-
Has an asbestos review been completed?
-
Is the project notifiable? If yes provide a copy of the F10
-
Have all approvals and permissions been obtained prior to commencing work?
Health & Safety Management Arrangements & Documentation
-
Is the relevant project Health & Safety documentation on site and displayed as appropriate, including but not limited to, F10, up-to-date Construction Phase Plan, HSE Law Poster, insurances, site rules, emergency procedures and H&S policy, etc.?
-
Risk assessments and method statements: has the Contractor developed, communication, implemented and maintained suitable and sufficient risk assessments and method statements appropriate to the work being completed and reflective of the associated risks?
-
Are those people completing the task aware of the contents of the risk assessments and method statements, and have signed to acknowledge receipt and understanding?
-
Has the PC implemented a suitable and sufficient 'permit to work' system and co-ordinated with the store where works are required outside of the defined project area?
-
Are there any changes to the scope or plan of work, or the design?
-
Have these changes been communicated to the PD and assessed for related / residual risks?
-
Where the project lasts longer than one month has the PC updated their CPP and related H&S arrangements and re-issued to the PD (note: Tesco require CPP's to be updated on a monthly basis in accordance with SOP 4).
Security, Access & Segregation
-
Have suitable arrangements been implemented to record site attendance (signing-in/out) for workers, suppliers, visitors, etc.?
-
Where the store / site signing-in/out arrangements are being used, are all operatives signing-in / out correctly?
-
Has a safe means and access and egress been provided for vehicles and pedestrians (segregated), secured with lockable gates, suitable and sufficient signage warning, and Tesco branding / signage installed?
-
Has a suitable and sufficient traffic management plan been developed and implemented, which, where necessary, conforms to Chapter 8.
-
Have all tools, equipment, materials, debris, etc. been suitably segregated?
-
Have all 'means of escape', fire doors, and final exit doors free from obstruction, or were obstructions exist a suitable alternative arrangements implemented?
-
Are there adequate safeguards in place to protect the public from site activities, including suitable diversions and physical protective measures? Note: the use of bunting tape / chapter 8 fencing not suitable for public segregation.
Emergency Procedures
-
Are procedures in place for site specific risks (petroleum escape, gases, flooding, rescue from water/height, etc.) and is there a suitable emergency response / evacuation plan in place?
-
Have suitable numbers of competent people been assigned emergency response duties (fire wardens / marshals, first aiders, spillage control, etc.)?
-
Has the Contractor tested their emergency arrangements, recorded the findings and any learnings from the drills?
-
Have all accidents, incidents and near misses been reported, recorded and, where necessary investigated with corrective and preventative measures identified and implemented?
Training & Competence
-
Has a suitable and sufficient process been applied to completing and delivering project H&S inductions?
-
Are all induction records up-to-date and matching the signing-in records?
-
Does the site maintain a 100% record of all persons holding a suitable CSCS or alternative H&S affiliation card and have all operatives undergone the relevant Tesco Academy training within the past 12 months, including for all suppliers and sub-contractors?
-
Are training records/evidence held for those people operating plant and equipment on site (MEWP, Dumper, Cranes, Forklifts, Power activated tools etc.)?
-
Are toolbox talks carried out frequently and cover topics relevant to site works, with completion / attendance records available?
-
Does the site have adequate site management provision on site at all times? [Managers who have attained the CITB site managers certificate or equivalent qualification and demonstrate the required competencies]?
Contractor Inspections (lines of defense)
-
Are Health & Safety assurance inspections being carried by the PC / Contractors, with records available?
-
Have all relevant statutory inspections been carried out, including but not limited to, excavations and temporary works, scaffolding, electrical installations & equipment, pressure testing, insurance inspections, etc.
-
Have the works been subject to any Regulator inspections?
-
Was any form of enforcement actions taken?
-
Have any identified actions been closed-out?
-
Have any actions from previous PD audits been closed-out?
Good Order & Housekeeping
-
Is the work area in good order with controls in place to prevent slips, trips, and falls, etc.?
-
Is material storage satisfactory?
-
Has waste been suitably segregated / removed to a safe location?
-
Is there sufficient lighting of the working area and access routes / hazards?
-
Are all tools / equipment / materials contained within the segregated working area (not protruding beyond the barriers)?
-
Have all arrangements been implemented to manage neighbourhood issues, noise, dust, light, and other 'statutory nuisance'.
Work at Height
-
Are all working at height activities covered by a active Permit to Work?
-
Scaffolds: where TG20 does not apply, are scaffold designs in place, erected by a competent person, tagged and inspected (within the past seven days and / or after alterations)?
-
Scaffolds: is the installed scaffold complete with suitable protective measures for the intended use, and appears to be in a safe condition?
-
Scaffolds: have suitable protective measures been installed / applied to prevent unauthorised access (secure fencing, ladders removed / locked, alarms / CCTV, etc.)?
-
Mobile towers: Is the equipment suitable for use, erected by a competent person (PASMA), complete with locking wheels, guard rails, suitable working platforms, and suitable for the ground conditions?
-
Ladder & Stepladder Work: Is there a suitable and sufficient risk assessment covering the tasks?
-
Ladder & Stepladder Work: Are all ladders / stepladders included on an inspection register and being stored safely?
-
MEWPs: Have all operators received certified training (IPAF) and are using harnesses with short (750mm) lanyards attached to suitable anchor point?
-
MEWP's: is the MEWP being used safely and in accordance with the associated Risk Assessment and any limitations of use?
-
MEWP's: has a suitable and sufficient rescue plan been developed and communicated to those supervising the working at height operation to allow safe emergency response and lowering of the cradle in an emergency?
-
Roof works: Are there suitable and sufficient control arrangements in place to prevent people or materials falling from height?
-
Roof works: have all fragile surfaces been identified and suitably protected?
-
Dropped / falling objects: has a suitable plan been developed and implemented to prevent dropped / falling objects from causing harm?
-
Voids and chambers: have all openings to shafts, chambers, voids, tanks, services, etc. been identified and covered / protected?
Tools & Equipment
-
Are all hand and power tools in 'good order', free from obvious defects, and being used as intended?
-
Are all required guards in place, correctly fitted and adjusted?
-
Where required, have all tools and equipment been inspected and tested with records available?
Electrical Safety
-
Are site installations compliant with BS7671, and have a valid 3 monthly installation test certification (cabins, mess huts, etc.)?
-
Are all electrical works being completed by competent operatives?
-
Are 'live working' prohibitions in place and being followed?
-
Has a suitable safe system of work and Lock Out / Tag Out procedure been implemented, and circuits verified as 'dead'?
-
If existing containment systems are being used, have these been assessed for suitability?
Plant, Equipment & Lifting
-
Has all plant and equipment, including lifting equipment and tackle, been inspected and certified as 'safe'?
-
Is all plant and equipment being operated by competent people?
-
Is all plant and equipment safely secured when not in use?
-
Are the controls required for safe lifting detailed within a lifting plan?
-
Are daily operator checks completed and recorded for all items of plant?
-
Has suitable and sufficient 'safe systems of work' been applied to the use of plant and equipment?
Hot Working & Fire Prevention
-
Has the PC included fire prevention and response arrangements within the project induction, safety briefings / tool box talks, and site inspections?
-
Are all 'hot works' covered by an active store / site permit to work?
-
Are 'hot working' tasks controlled through a suitable and sufficient 'safe system of work' that includes prohibitions around works commence within 60mins of the end of the working shift, and the provision of a 60min fire watch?
-
Have the fire detection / sprinkler systems been isolated and the required 'impairment' notifications been obtained from Fire Safety Group?
-
Has all combustible materials and debris been removed from the working area or been suitably protected?
-
Are a suitable number / type of fire extinguishers in place, clearly visible, and have been inspected as required?
-
Have all combustible items, waste bins / skips, fuel, etc. been stored a minimum of six [6] meters from the building façade, means of escape, fire doors, etc.?
Hazardous Substances
-
Have all hazardous substances and materials been assessed for their suitability and safety, recorded, and supplied with a current material safety data sheet?
-
Are all hazardous substances and materials being stored, transported, used, and disposed of in accordance with all relevant obligations?
-
Has suitable and sufficient PPE/RPE been provided to those exposed to the hazardous substances / materials?
Excavations & Confined Spaces
-
Have all works been planned by a competent person with all required controls detailed within a suitable and sufficient 'safe system of work'?
-
Have competent operatives been selected to complete the work?
-
Have all operatives been briefed on the Health & Safety controls, emergency arrangements, and methods of working as part of the task inductions / safety briefing?
-
Have all access and egress arrangements, including entry logs, rescue arrangements been provided and tested to confirm suitability?
-
Have all items of air monitoring equipment and associated LEV been provided?
-
Have all temporary works been designed, installed, and inspected by competent people?
-
Have all required inspections been completed by a competent person and recorded?
-
Have all surveys, line-searches, etc. been completed to identify the location of buried services?
Welfare & Occupational Health
-
Has the PC / Contractor identified and provided suitable welfare for the number of workers and the tasks being completed?
-
Where facilities are being shared with the store / site, are these suitable?
-
Are the facilities clean, well-stocked, and well maintained?
-
Has the PC / Contractor identified any required 'occupational health' requirements and implemented health surveillance?
-
Has the PC / Contractor provided an Employee Assistance Programme and / or mental health awareness / support programme?
Asbestos
-
Has a refurbishment & demolition asbestos survey been carried out for this project, and is the survey available on site?
-
Does the survey cover all working areas and are arrangements in place to manage those areas containing asbestos?
-
Has the Asbestos Consultant confirmed a removal / remediation plan?
-
Have all air tests and air clearance activities been completed with certificates issued?
-
Have suitable and sufficient controls been applied to prevent the accidental release of asbestos fibres?
Customer & colleague safety
-
Is the customer journey around the project / location of works satisfactory?
-
Has the Contractor kept the Store Manager informed of progress, and co-ordinated works sufficiently to minimise disruption to the store?
-
Has the store / site received any complaints relating to the works?
-
Has the Contractor implemented a good neighbour procedure / considerate constructor procedure?
-
Have suitable and sufficient precautions been implemented to protect the safety of store colleagues and customers from harm, including adequate segregation?
PFS work
-
Has a Permit to Work been obtained from the PFS manager / duty manager?
-
Have all operatives working on Petrol Filling Stations completed the UKPIA/SPA training and hold the associated skills card?
-
Have works, and the associated controls, within the ATEX zones been detailed within a suitable and sufficient 'safe system of work', which is in accordance with Blue Book?
-
Where necessary, have controls been implemented to prevent collision / damage to the dispensing equipment, hoses, breather vent pipes, refuelling manifold, tanks and covers, etc.?
-
Are all hand / power tools 'anti-spark', EX, ATEX rated?
-
Have suitable and sufficient 'safety systems of work' been developed and implemented appropriate to working on a PFS?
Critical feedback
-
Conclusion, noting that a audit score below 90% is an fail.
-
Please identify things that the PC / Contractor has done well?
-
Please identify any opportunities for improvement?