Information
-
STORE NAME:
-
STORE No.
-
SURVEY DATE :-
-
ADDRESS:
STORE INFORMATION
-
STORE MANAGER
-
OPENING TIMES:
INSTALLATION DATES:
-
NIGHT 0:
-
NIGHT 1:
Hardware Requirements
-
Have all cabinets been accessed to check for spare port availability?
-
Which cabinets are you unable to access:
-
Do any data cabinets require special access?
-
Which cabinets and what is required:
MDF: Please provide the number of spare ports that are available within the specific data cabinets (visual check):
-
S/W 1
-
PORT NOs AVAILABLE:
-
S/W 2
-
PORT NOs AVAILABLE:
-
S/W 3
-
PORT NOs AVAILABLE:
-
S/W 4
-
PORT NOs AVAILABLE:
-
S/W 5
-
PORT NOs AVAILABLE:
-
New Switch Required?
IDF 1: Please provide the number of spare ports that are available within the specific data cabinets (visual check):
-
S/W 1
-
PORT NOs AVAILABLE:
-
S/W 2
-
PORT NOs AVAILABLE:
-
S/W 3
-
PORT NOs AVAILABLE:
-
S/W 4
-
PORT NOs AVAILABLE:
-
S/W 5
-
PORT NOs AVAILABLE:
-
New Switch Required?
IDF 2: Please provide the number of spare ports that are available within the specific data cabinets (visual check):
-
S/W 1
-
PORT NOs AVAILABLE:
-
S/W 2
-
PORT NOs AVAILABLE:
-
S/W 3
-
PORT NOs AVAILABLE:
-
S/W 4
-
PORT NOs AVAILABLE:
-
S/W 5
-
PORT NOs AVAILABLE:
-
New Switch Required?
IDF 3: Please provide the number of spare ports that are available within the specific data cabinets (visual check):
-
S/W 1
-
PORT NOs AVAILABLE:
-
S/W 2
-
PORT NOs AVAILABLE:
-
S/W 3
-
PORT NOs AVAILABLE:
-
S/W 4
-
PORT NOs AVAILABLE:
-
S/W 5
-
PORT NOs AVAILABLE:
-
New Switch Required?
IDF 4: Please provide the number of spare ports that are available within the specific data cabinets (visual check):
-
S/W 1
-
PORT NOs AVAILABLE:
-
S/W 2
-
PORT NOs AVAILABLE:
-
S/W 3
-
PORT NOs AVAILABLE:
-
S/W 4
-
PORT NOs AVAILABLE:
-
S/W 5
-
PORT NOs AVAILABLE:
-
New Switch Required?
Scanner Wall
DATA DETAILS (1 port/wall + 1 spare for group)
-
Is Wall located adjacent to Rescan or Separated?
-
Location of walls:
-
Which IT Data cabinets were used?
-
Location of Data Cabinets:
-
Is Data fed from ceiling or under floor fed?
-
Quantity of additional data outlets required:
-
Do you require additional patch panels?
POWER DETAILS
-
Which consumer boards will supply?
-
Location of consumer boards:
-
Were you able to access consumer board at survey?
-
Breaker labelled?
- Yes
- No
-
Breaker description that supplies:
-
Is power fed from ceiling or under floor fed?
Produce Scales
DATA DETAILS:
-
How many scales are being installed excluding Rescan Scale?
-
Are all fed from same data cabinet?
-
Which IT Data cabinets were used?
-
Location of Data Cabinets:
-
Is Data fed from ceiling or under floor fed?
-
Quantity of additional data outlets required:
-
Do you require additional patch panels?
POWER DETAILS
-
Which consumer boards will supply?
-
Location of consumer boards:
-
Were you able to access consumer board at survey?
-
Breakers labelled?
- Yes
- No
-
Breaker description that supplies:
-
Is power fed from ceiling or under floor fed?
Confidential Office File Server
DATA DETAILS (3 ports for server + 1 spare required)
-
Which IT Data cabinets were used?
-
Location of Data Cabinets:
-
Is Data fed from ceiling or under floor fed?
-
Quantity of additional data outlets required:
-
Do you require additional patch panels?
POWER DETAILS
-
Location of sockets to be installed in Confidential Office:
-
Which consumer boards will supply?
-
Location of consumer boards:
-
Were you able to access consumer board at survey?
-
Breakers labelled?
- Yes
- No
-
Breaker description that supplies:
-
Is power fed from ceiling or under floor fed?
Payment Terminals
DATA DETAILS (1 port/terminal)
-
Which IT Data cabinets were used?
-
Location of Data Cabinets:
-
Is Data fed from ceiling or under floor fed?
-
Quantity of additional data outlets required:
-
Do you require additional patch panels?
POWER DETAILS
-
Which consumer boards will supply?
-
Location of Payment Terminals:
-
Location of consumer boards:
-
Were you able to access consumer board at survey?
-
Breakers labelled?
- Yes
- No
-
Breaker description that supplies:
-
Is power fed from ceiling or under floor fed?
Access Points
DATA DETAILS - near to scanner wall (2 Outlets/AP)
-
How many APs are being installed? Should be 3 as standard.
-
Location of APs: They MUST be above scanner wall
-
Which IT Data cabinets were used?
-
Location of Data Cabinets:
-
Is Data fed from ceiling or under floor fed?
-
Quantity of additional data outlets required:
-
Do you require additional patch panels?
Rescan Bench UPS
DATA DETAILS (1 outlet/UPS)
-
Location of rescan bench:
-
Which IT Data cabinet was used?
-
Location of Data Cabinet:
-
Is Data fed from ceiling or under floor fed?
-
Quantity of additional data outlets required:
-
Do you require additional patch panels?
POWER DETAILS (UPS power socket should be fed from clean board in confidential office)
-
Which consumer boards will supply?
-
Location of consumer boards:
-
Were you able to access consumer board at survey?
-
Breakers labelled?
- Yes
- No
-
Breaker description that supplies:
-
Is power fed from ceiling or under floor fed?
Sign Off
-
Additional information - Extra works
-
Survey carried out by:
-
Surveyor to complete survey and send along with Verizon Change request to Tesco.says@isg-technology.com