Information

  • Installer name:

  • SSAIB Reference no:

  • Audit conducted by:

  • Audit date

  • Installation date

  • Client / Site

  • Location
  • SSAIB Certificate number:

  • Premises type:

  • System type

  • Note: CP Clause references are in brackets

  • 1 - Control equipment<br>Secure fixing to fabric (4.5 & 4.6). <br>Within supervised area (4.7)<br>Suitable for the environment (3.5.13)<br>Size and capacity of power supplies / UPS (3.6 & 3.97)<br>Mains power (4.8)<br>Functionality (5)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • 2 - Readers & code pads Secure fixing to fabric (4.5 & 4.6) Functionality (5)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • 3 - Break glass points <br>Secure fixing to fabric (4.5 & 4.6)<br>Functionality (5)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • 4 - Request to exits<br>Secure fixing to fabric (4.5 & 4.6)<br>Functionality (5)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • 5 - Locks<br>Secure fixing to fabric (4.5 & 4.6)<br>Functionality (5)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • 6 - Doors<br>Door closures and Functionality (5)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • 7 - On-line systems<br>General and Functionality (5)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • 8 - Audio visual equipment<br>Call points & handsets (4.5 & 4.6)<br>Functionality (5)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • 9 - Detection equipment<br>(4.5 & 4.6)<br>Functionality (5)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • 10 - Power supplies<br>Mains connections (4.8)<br>Output voltage is within the required range (6.2)<br>Standby batteries dated (6.7)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • 11 - Cabling<br>Routing (4.1)<br>Segregation within containment (4.4.2)<br>Segregation within control equipment (4.8)<br>Suitable cable type (4.4.3)<br>Grommets & glands (4.4.5)<br>Fire stopping where applicable (4.4.6)<br>Cable marking (4.4.7)<br>Containment ( ceiling to floor ) (4.4.8)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • 12 - Commissioning of system<br>Has been undertaken using a suitable checklist (5.1)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • 13 - The output voltage of all power supplies have been recorded (6.2)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • 14 - The operating voltages at devices that require a significant amount of current have been recorded (6.3)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • 15 - The current supplied by each power supply has been recorded (6.9)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • 16 - Capacity of all batteries have been recorded (6.9)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • 17 - Any specified interface / link with another system, e.g. Fire Alarm, has been tested / simulated.<br>Where applicable (3.3)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • 18 - Handover of system<br>The client has received training (7.1)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • 19 - Operating instructions / manuals have been handed to client (7.1)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • 20 - The SSAIB certificate of conformity has been issued (7.2)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • 21 - Card / fob holder records are available ( if applicable ) (7.4)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • 22 - Acceptance document with checklist as been issued (7.5)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • 23 - Where appropriate the client should be advised to notify the local fire prevention officer (7.6)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • 24 - Records<br>"As installed" document or record of amendments to the specification (3.4)

  • 24 - Historical record (10.4)

  • 24 - Overall standard of installation (5.2)

  • Comments

  • Add media

  • OBS No.

  • NCR No.

  • Auditors comments

  • Auditors comments

  • System to be re-inspected at installers expense

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.