Information
-
Subdivision Name
-
Stage
-
Reeds Project Number
-
Conducted on
-
Prepared By
-
Form: Construction
-
Weather
-
Site Conditions
-
Type of Audit?
- Road & Drainage
- Sewer
- Water & Recycled Water
Tap to enter information
Road & Drainage
-
Tree Clearing
Tap to enter information
-
Comments
-
Stripping
Tap to enter information
-
Comments
-
Bulk Earthworks
Tap to enter information
-
Comments
-
Boxing
Tap to enter information
-
Comments
-
Drainage
Tap to enter information
-
Comments
-
Pits
Tap to enter information
-
Comments
-
Subgrade Improvement
Tap to enter information
-
Comments
-
Subsoil Drains
Tap to enter information
-
Comments
-
Sub Base FCR
Tap to enter information
-
Comments
-
Upper Sub Base FCR
Tap to enter information
-
Comments
-
Base FCR
Tap to enter information
-
Comments
-
Asphalt
Tap to enter information
-
Comments
-
Conduits (Road Crossings)
Tap to enter information
-
Comments
-
House Drains
Tap to enter information
-
Comments
-
Electrical Works
Tap to enter information
-
Comments
-
Telstra Works
Tap to enter information
-
Comments
-
Kerb & Channel
Tap to enter information
-
Comments
-
Footpath
Tap to enter information
-
Comments
-
Crossings
Tap to enter information
-
Comments
Tap to enter information
Sewer
-
Retail Water Authority
-
Retail Water Authority Project Number:
-
Contractor
1. Protection of People, Property & Environment
-
1.01. Trenching Operations (Benching & Shields) - Cl13.5
-
1.02. Site Plant & Equipment
-
1.03. Helmets if appropriate
-
1.04. steel capped Boots
-
1.05. Safety Vests
-
1.06. Parawebbing of Non Working Open Trenches
-
1.07. Egress From Site - Traffic Control?
2. Materials Inspection
-
2.01. Storage and Handling of Materials
-
2.02. Materials and Products Meet Authorised Purchase Specification
-
2.03. Delivery Inspection of Products and Materials
-
2.04. Are current plans /specifications onsite
3. Excavations
-
3.01. Visual Inspection of Survey Set Out
-
3.02. Shoring, Benching, Battering
-
3.03. Excavation Tolerances
-
3.04. De-watering, Bulkheads & Trench Drainage
-
3.05. Blasting Compliance
-
3.06. Foundation Improvement Required
-
3.07. Stockpiling of Excavated Material
4. Installation of Pipelines
-
4.01. Accredited Main Layer on site
-
4.02. Trench Floor Preparation & Bedding Placement
-
4.03. Pipe Jointing - Cleaning, Inspection, and Preparation
-
4.04. Pipe Laying to Required Line and level
-
4.05. Property Connection Sewers & Marker Tape to standard
-
4.06. Trenchfill: Approved Material Only & Layered
-
4.07. Compaction to Standard
5. Structures
-
5.01. Pre Cast Conforming - Dimensions, Cover, Frame, Collar/Taper
-
5.02. In Situ Conforming - Dimensions, Cover & Frame
-
5.03. Shaft Assembled with Steps and & Spacing Correct
-
5.04. Sealant, Make Up Rings 7 Lids to Standard
-
5.05. Concrete Type to Specification
6.0 Connection to Existing Manholes
-
6.01. All Relevant QA Documentation Previously Provided
-
6.02. Approved Personnel Conducting Works
-
6.03. OH&S Requirements are being met - copy of Live Entry Permit on site - Entry No. and Expiry Date & Time
-
6.04. Connection to Live Sewer - Existing Junction / Cut in Junction
7. Practical Completion Inspection
-
7.01. Site Cleared and Restored
Tap to enter information
Water
-
Retail Authority
-
Retail Water Authority Project Number
-
Contractor
1. Protection of People, Property and Environment
-
1.01. Trenching Operations (Benching & Shields)
-
1.02. Helmets
-
1.03. Steel Capped Boots
-
1.04 Safety Vests
-
1.05. Parawebbing of Non Working Open Trenches
-
1.06. Egress From Site - Traffic Control?