Title Page

  • Conducted on

  • Store Name

  • Tenant Coordinator/LL Representative

  • Prepared by

  • Location

Inspection Checklist

Front of Store

  • Shopfront, Glazing, Tracks, Fins

  • Silicone joints/Glazing Beads/Timber Grounds

  • Doors operations and Secure

  • Top and Bottom rails plates and end caps

  • Lock sets x 2

  • Flush Bolts

  • Door handles

  • Finish of Aluminium

  • Shopfront Columns

Walls : Trading Area (FOH)

  • Level and Smooth

  • Painted/Primered

  • Full height Security Mesh

Floors : Trading Area (FOH)

  • Level and smooth

  • Expansion joints

  • Migua Joints

Ceilings : Trading Area (FOH)

  • Level and Parallel

  • Height Correct

  • Ceiling boards clean

  • Control Zone bulkheads correct

  • Open Void sprayed correct colour

Doors : Fire Escape/Service Doors

  • Roll up doors

  • Fire Escape door to TFG Spec

  • Correct Door ironmongery of Fire Escape door

  • Push Bar on Fire Escape Door installed

  • Thumb locks on Fire Escape Doors

  • Door steel Cladded

  • Peephole

  • Door break glass (if applicable)

Electrical

  • DB Completed as per TFG Spec

  • Plugs completed as per TFG Spec

  • Power Skirting installed

  • Lighting operational and correct lux levels

  • Key Switch installed

  • Power connected

  • Permanent power supply

IT Services

  • Telkom lines installed/Sleeve provided

  • Meet me Room completed

  • Fibre Lines/Connection box installed

Services

  • Sprinklers

  • HVAC 1st Fix

  • Smoke Detection 1st fix

  • Temp lighting

  • Fire Hose reels

  • Fire Extinguishers

  • Water supply (Hot/Cold)

  • Escalators/Lifts

  • Fire and Emergency Signage

Toilet Block

  • Correct Sanitaryware

  • Walls tiled to TFG Spec

  • Mirror installed

  • Doors with indicators bolts

  • Push plates to doors

  • Kick plates to doors

  • Door grills installed

  • Extraction installed

  • Cobra Self closing taps on Basins

  • Toilet roll holder installed

Kitchen Area

  • Sink installed to TFG Spec

  • Cobra Push on Demand Tap installed

  • Steel sink cupboard installed

  • Water meter installed

Site Security and Access

  • Site secure for BO period

  • Free and clear access to the store

COC's

  • Sprinklers

  • HVAC

  • FORM2 and FORM4

  • Smoke Detection

  • Electrical

  • Plumbing

  • Glazing

Photos of Site

  • Photos of site

Snags/Outstanding Requirements

Sign Off

  • TFG Project Manager

  • Tenant Coordinator/LL Rep

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.