Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Untitled Page
-
Project name:
-
Project No
-
Name:
-
Signature:
-
TMP Approval date:
-
TGS Number:
-
Date:
-
Inspection type
Desktop review
Is a copy of the location TMP and relevant TGS available?
-
If “NO”, inspection must not be undertaken until documents are obtained
Details of TMP and TGS:
Are the location TMP and relevant TGS approved?
If “NO”, work must be stopped until documents are approved
-
Comments or details of action taken:
Site Inspection
Inspection completed:
-
Inspection completed
Signs and devices positioned as prescribed and commanding attention?
-
If “NO”, provide details and rectify signs
-
Comments or details of action taken:
-
Sign sizes as prescribed?
If “NO”, provide details and rectify signs
-
Comments or details of action taken:
Signs are mounted level and suitably clear of travel lanes?
If “NO”, provide details and rectify signs
-
Comments or details of action taken:
Has temporary delineation been applied as prescribed, with permanent markings obliterated?
If “NO”, provide details of action required to rectify delineation
-
Comments or details of action taken:
Are registered trailers i.e. VMS / light towers suitably clear of travel lanes and delineated?
If “NO” provide details and rectify location
-
Comments or details of action taken:
Are temporary speed zones operating as prescribed?
If “NO”, provide details and discuss with Work Supervisor
-
Comments or details of action taken:
Are Portable Traffic Control Device (PTCD) positioned as prescribed in TGS?
If “NO”, provide details of action required to rectify
-
Comments or details of action taken:
Are manual traffic controllers clear of travel lane, have suitable escape route?
If “NO”, provide details of action required to rectify
-
Comments or details of action taken:
Are site accesses and egresses well defined and safe for work vehicles?
If “NO”, provide details of action required to rectify
-
Comments or details of action taken:
Termination signs are suitably located i.e. downstream of last activity?
-
If “NO”, provide details of action required to rectify
-
Comments or details of action taken:
Post site inspection confirmation
Is worksite layout operating safely as intended?
If “NO”, provide details and implement controls to rectify
-
Comments or details of action taken:
Has TMP identified and addressed key TTM risks?
If “NO”, provide details and implement controls to rectify
-
Comments or details of action taken:
Have key Temporary Traffic Management (TTM) risks been addressed on site?
If “NO”, provide details of additional hazards and controls required
-
Comments or details of action taken:
Have copies of Shift/Daily Inspections been sighted as completed as required?
If no provide details and discuss with nominated rep completing Shift Inspections
-
Comments or details of action taken:
-
Additional comments: