Title Page

  • Document Reference

  • Conducted on

  • Prepared by

GHELAMCO

  • Name/Signature:

  • Date:

Curtain Wall Handover

Brackets

  • Check bracket is free of defects/damages.

  • Check if brackets are installed as per drawing. <br>Correct bolts and washers, line & level within acceptable tolerances, serrated washers engaged correctly with base brackets serration, use of correct shims)

  • Top M12 anchor bolts to be checked with torque ....Nm & sprayed.

  • Bottom M16 anchor bolts to be checked with torque Nm & sprayed.

Curtain Wall

  • Check the mullion and transom has been installed as per drawing.

  • Check aluminium flashing is installed.

  • Check EPDM is applied as per drawings & bonded as per manufactures standards.

  • Check rockwool has been installed as per drawing & adequately compressed into the opening.

  • Check the glass has been installed in the correct orientation. From inside: Kite mark bottom left.

  • Check glass for damages/scratches/dents.

  • Check if the pressure plates, screws and caps are installed as per drawing .

  • Check sealant is applied continuously & without damages/defects.

  • Is the CW protected as per RAMS.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.