Title Page
-
Conducted on
-
Prepared by
-
Bakery?
-
Customer ?
- Tesco
- Coop
- Waitrose
- M&S
- JS
- Ginsters
- Morrison’s
- Lidl
- Aldi
- Asda
-
Trial reference number?
-
Objectives of trial?
-
Summary, next steps and escalation where needed - to be completed by the process tech
-
New raw material into The Cornwall Bakery?
-
New raw materials?
-
Any new tooling?
-
New tooling?
Cold Mix
-
Does the product have a cold mix?
-
CM/Dev code?
-
Version number?
-
Mixer number?
- Tamar mixer 1
- Tamar mixer 2
- Tamar mixer 3
- Tamar mixer 4
- Tamar mixer 5
- Tote bin
- Lynher mixer 1
- Lynher mixer 2
- Lynher veg mixer
- Lynher risco mixer
- Lynher CFS mixer
-
Batch size?
-
Amount of mixer?
-
Attendees?
- Brandon
- Nick
- She
- Steph
- Alex
- Nicola
- Prep team
-
Time taken to weigh up?
-
Time taken to mix?
-
Was the cold mix weighed and mixed correctly as per recipe and no adjustments needed?
-
If adjustments needed have these been approved by the technical process manager?
Vat Cook
-
Does the product have a vat cook?
-
CF/Dev Code?
-
Version number?
-
Vat number?
- Tamar vat 1
- Tamar vat 2
- Tamar vat 3
- Tamar vat 4
- Tamar vat 5
- Lynher vat 1
- Lynher vat 2
- Lynher vat 5
- Lynher vat 6
- Lynher BCH 1
- Lynher BCH 2
-
Batch size?
-
Amount off mixer?
-
Does the vat cook contain protein?
-
Cooking time of protein?
-
Viscosity?
-
Attendees?
- Brandon
- Nick
- She
- Steph
- Alex
- Nicola
- Prep team
-
Time taken to weigh up?
-
Time taken too cook?
-
Was the vat cook weighed correctly, cooked correctly with viscosity and yield achieved as per recipe and no adjustments needed?
-
If adjustments needed have these been approved by the technical process managers
Pastry
-
Does this product have a pastry mix?
-
AA/LP/Dev code
-
Version number?
-
Mixer name?
- Tamar Mixer 1
- Tamar Mixer 2
- Tamar Mixer 3
- Tamar pastry plant
- Lynher Diosna 1
- Lynher Diosna 2
- Lynher pastry plant
-
Mix type?
-
Time taken to mix?
-
Attendees?
- Brandon
- Nick
- Sue
- Steph
- Alex
- Nicola
- Pastry room team
-
Was the pastry mix weighed and mixed correctly as per recipe and adjustments needed?
-
If adjustments needed have these been approved by the technical process manager?
Production
-
Was the product run in production?
-
UB/Dev code?
-
Version number?
-
Line name?
- Tamar pie line 1
- Tamar pie line 2
- Tamar pie line 3
- Tamar pie line line 4
- Tamar rotary pie line
- Tamar flex line
- Tamar uni 1
- Tamar uni 2
- Tamar uni 3
- Tamar off line
- Lynher line 1
- Lynher line 2
- Lynher line 3
-
Run rate?
-
Number of staff?
-
Line pastry wastage percentage?
-
Fill weight range?
-
Pastry weight range?
-
Attendees
- Brandon
- Nick
- Sue
- Steph
- Alex
- Nicola
- Production team
-
Was the product made correctly as per the costed run rate and as per control sheet, including all weights met and within tolerance and no adjustments needed?
-
If adjustments needed have these been approved by the technical process manager?
Ovens
-
Was the product baked?
-
Oven name/number
- Tamar rack 1
- Tamar rack 3
- Tamar rack 3
- Tamar rack 4
- Tamar rack 5
- Tamar rack 6
- Tamar rack 7
- Tamar band 1
- Tamar band 2
- Tamar band 3
- Lynher band 1
- Lynher band 2
- Lynher band 3
-
Bake reference number?
-
Attendees?
- Brandon
- Nick
- Sue
- Steph
- Alex
- Nicola
- Oven operators
-
Data paq used?
-
Was the data paq successful?
-
Comark probe used?
-
Was the comark probe successful?
-
Was the internal temperature reached?
-
Does the bake need changing?
-
How does the bake need changing?
-
Was bake loss done?
-
Bake/chill loss (see bake loss form for details)
-
Target weight?
-
Actual weight?
-
Bake/chill loss % achieved?
-
Was hot bake loss carried out?
-
Pre chill percentage average weight loss?
-
If adjustments needed have these been approved by the technical process manager?
Packing
-
Was a packing trial carried out by the process tech?
High risk packing
-
Line?
-
Format?
-
Run rate?
-
Number of staff?
-
Reject levels?
-
Attendees?
Engineering
-
Was all the tooling and equipment working correctly?
-
Issues that we present?
-
Issues that were present?
-
If adjustments needed have these been approved by the technical process manager?
Finished product
-
Were finished product produced
-
Height range?
-
Width range?
-
Length range?
-
Comments from panel?
-
Top down picture
-
Side view picture
-
Cross section picture
-
Base picture
-
Any other info?
-
Other info
-
Other pictures
Sign off
-
Process Technologist
Name:
Signature:
Date:
Preparation
Name:
Signature:
Date:
Manufacturing
Name:
Signature:
Date:
Packing
Name:
Signature:
Date:
Engineering
Name:
Signature:
Date:
Technical process manager
Name:
Signature:
Date: