Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. Safety Administration
-
A) Federal Posters posted
-
B) Site Specific Safety Information Posted
-
C) First Aid Kit Supplied-Stocked
-
D) Fire Extinguishers in place / Current Inspection
-
E) MSDS Book
-
F) Toolbox Meetings Filed
-
G) Job Hazard Analysis Filed<br>
-
H) Other
2) Housekeeping / Site Hazards
-
A) Work Areas Clean and Free of Excess Trash and Debris
-
B) Adequate Lighting
-
C) Passageways & Walkways Clear
-
D) Terrain / Leading Edges / Excavations Identified
3) Personal Protective Equipment / Stocked
-
A) Hard Hat, Safety Glasses, Steel/Metatarsal Boots
-
B) Hearing Protection
-
C) Respiratory Protection
-
D) FR Clothing / Chemical Suits
-
E) Other
4) Lockout / Tagout
-
A) Lockout/Tagout Program in Place
-
B) Stations Stocked with Padlocks and Tags
-
C) Proper Paperwork Completed and Filed
5) Hand Tools, Power Tools and Power Equipment
-
A) All Mechanical Safeguards in Place / Ladders Inspected
-
B) Cords in Good Condition, Elevated, or Protected
-
C) Tools and Cords Inspected for Assured Grounding
-
D) Non-Functioning tools tagged properly to be sent for repairs
-
E) Additional Non-Conformance tags stocked
-
F) Tool Transfer Forms completed and filed
-
G) Calibration Records up to date
6) Storage Area
-
A) Stock Organized and Marked
-
B) Hardware Stocked
-
C) Overstocked / Understocked
-
D) Materials Protected from Damage/Weather
-
E) Adequate Lighting
-
F) Passageways & Walkways Clear
7) Office Supplies
-
A) Sufficient Office Supplies Stocked
-
B) Sufficient Company Forms Stocked
-
1) Req Book, Daily Journals, Voucher Books
-
2) Time Sheets, Disciplinary Action Forms
-
C) New Hire / Training Forms and Materials
8) Office Area
-
A) Clean / Organized
-
B) Equipment in Working Condition
-
C) Data Comm in place - Internet, Phone/Fax
9) Materials
-
A) Requisitions filled out properly with Account Numbers
-
B) Packing slips signed and turned in
10) Work Plans / Project Schedule
-
A) Project Schedule on site / Latest Revision
-
B) Daily Work Journals completed to date / Copies to PM
-
C) Manpower is productive
-
D) RFI's Submitted / Questions answered
11) Change Vouchers
-
A) Vouchers completed properly
-
B) Vouchers up-to-date
-
C) Current Change Order Log in place
12) Timesheets
-
A) Completed and filed properly
-
B) Employee numbers on sheet / Labor Account Codes
13) Disciplinary Action Documentation
-
A) Disciplinary Action book on site
-
B) Book in use and filled out properly
14) Drawings
-
A) As-Builts up-to-date
-
B) Dimensions on As-Builts for locations and routings
-
C) Initialed by Inpsector for changes
-
D) All As-Built changes backed up with corresponding RFI
-
E) Working off Current Drawings / Latest Revision
Job Progress
-
A) Is project progressing according to schedule?
-
B) Are we being held up by other trades?
-
C) Do we have unanswered RFI's that are impeding our progress?
Job Photos
-
Add media
Additional Comments
-
Signature From Evaluator: