Title Page

  • Customer Name

  • Client address

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Questions

  • Is the insulation material suitable for use with the property’s exposure level to wind driven rain?

  • Does the form of the construction of the property suggest that it was suitable for the material that has been installed

  • Does the current condition of the property suggest that it was suitable for the material that has been installed?

  • Does the drill pattern conform to the appropriate material compliance certificate?

  • Have all injection holes been filled & been finished to an acceptable aesthetic standard?

  • Are all airbricks and eves vents clear of insulation?

  • Are combustion vents/flues/chimneys clear of insulation and in compliance with HSE/CIGA guidance?

  • Have combustion air core vents been fitted where required?

  • Is there any evidence of the escape of insulation?

  • Are there any signs of damp or condensation?

  • Where a 'virgin' cavity has been claimed is there any evidence of CWI extraction?

  • Have cavity brushes been fitted where required?

Party wall insulation

  • Does the drill pattern confirm to the appropriate material compliance certificate?

  • Does the lancing pattern conform to the appropriate material compliance certificate?

  • Have all party cavity walls been insulated?

  • Have all injection holes been filled?

Scoring questions

  • Does the heating system installed match the notified measure type?

  • Does the property type match the notified property type?

  • Does the number of bedrooms match the notified number of bedrooms?

  • Is the notified percentage of the property treated a reasonable reflection of the actual percentage of the property treated when rounded to the nearest multiple of 10%?

  • Does the type of boiler installed match the type of boiler notified?

  • Do the heating controls installed,thermostat and TRVs to all radiators except those in the room with the thermostat?

  • Does the wall construction type notified match at least 50% of the total external wall area of the property? You

Customer care

  • Was identification provided by installation team?

  • Did we provide all tools and dust sheets where necessary?

  • Did we clean up satisfactory?

  • Has any damage occurred?

  • If damage occurred-has it been repaired satisfactory?

  • Inspector name and signature

  • Date of inspection

  • Customer name and signature

  • Date of inspection

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.