Title Page
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Is form work straight and true - properly braced?
-
Is panel square? -Maximum 1/8” in 10’ (non-cumulative) per SPEC
-
Are punched openings square and in correct location?
-
Is reinforcement steel correct size and spacing?
-
Is reinforcement steel properly chaired?
-
Are reinforcement steel lap coverages sufficient?
-
Are slab dowels, stirrups, hairpins etc installed per reinforcement drawings and properly tied?
-
Are embeds correct size and in correct location per panel embed drawings and properly secured/squared and leveled?
-
Is form liner placed where required and in good condition?
-
Are reveal and chamfer strips properly placed, straight and secured?
-
Are door frames, where required, squared and straight per construction documents?
-
Are electrical pathways installed and protected where required?
-
Are required blockouts installed properly?
-
Is Horizontal/Vertical sleeving installed where required and protected?
-
Is formed area clean and free of debris?
-
Is panel safe to pour?
-
Notes or Observations
-
Adolfson & Peterson representative
-
Hydro-Con representative
-
Add media