Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
TIMESHEET
MONDAY
-
CONTRACT NUMBER, NAME AND AREA OF WORKS, FOR THE WORK BEING CLAIMED FOR
-
INSULATION / VCL INSTALLED@RATE
-
MEMBRANE/LIQUID INSTALLED@RATE
-
SUBSTRATE/BALLAST INSTALLED@RATE
-
SLABS INSTALLED@RATE
-
DECKING/PLY LAID @RATE
-
LINEAR WORKS - PARAPET / UPSTANDS / GUTTERS @RATE (give descriptions)
-
PENETRATIONS @RATE (give descriptions)
-
DETAIL WORK @RATE (give descriptions)
-
OTHER WORKS @RATE (give descriptions)
-
TOTAL CLAIMED FOR TODAY
TUESDAY
-
CONTRACT NUMBER, NAME AND AREA OF WORKS, FOR THE WORK BEING CLAIMED FOR
-
INSULATION / VCL INSTALLED@RATE
-
MEMBRANE/LIQUID INSTALLED@RATE
-
SUBSTRATE/BALLAST INSTALLED@RATE
-
SLABS INSTALLED@RATE
-
DECKING/PLY INSTALLED@RATE
-
LINEAR WORKS - PARAPET / UPSTANDS / GUTTERS @RATE (give descriptions)
-
PENETRATIONS @RATE (give descriptions)
-
DETAIL WORK @RATE (give descriptions)
-
OTHER WORKS @RATE (give descriptions)
-
TOTAL CLAIMED FOR TODAY
WEDNESDAY
-
CONTRACT NUMBER, NAME AND AREA OF WORKS, FOR THE WORK BEING CLAIMED FOR
-
INSULATION / VCL INSTALLED@RATE
-
MEMBRANE/LIQUID INSTALLED@RATE
-
SUBSTRATE/BALLAST INSTALLED@RATE
-
SLABS INSTALLED@RATE
-
DECKING/PLY INSTALLED@RATE
-
LINEAR WORKS - PARAPET / UPSTANDS / GUTTERS @RATE (give descriptions)
-
PENETRATIONS @RATE (give descriptions)
-
DETAIL WORK @RATE (give descriptions)
-
OTHER WORKS @RATE (give descriptions)
-
TOTAL CLAIMED FOR TODAY
THURSDAY
-
CONTRACT NUMBER, NAME AND AREA OF WORKS, FOR THE WORK BEING CLAIMED FOR
-
INSULATION / VCL INSTALLED@RATE
-
MEMBRANE/LIQUID INSTALLED@RATE
-
SUBSTRATE/BALLAST INSTALLED@RATE
-
SLABS INSTALLED@RATE
-
DECKING/PLY INSTALLED@RATE
-
LINEAR WORKS - PARAPET / UPSTANDS / GUTTERS @RATE (give descriptions)
-
PENETRATIONS @RATE (give descriptions)
-
DETAIL WORK @RATE (give descriptions)
-
OTHER WORKS @RATE (give descriptions)
-
TOTAL CLAIMED FOR TODAY
FRIDAY
-
CONTRACT NUMBER, NAME AND AREA OF WORKS, FOR THE WORK BEING CLAIMED FOR
-
INSULATION / VCL INSTALLED@RATE
-
MEMBRANE/LIQUID INSTALLED@RATE
-
SUBSTRATE/BALLAST INSTALLED @RATE
-
SLABS INSTALLED@RATE
-
DECKING/PLY INSTALLED @RATE
-
LINEAR WORKS - PARAPET / UPSTANDS / GUTTERS @RATE (give descriptions)
-
PENETRATIONS @RATE (give descriptions)
-
DETAIL WORK @RATE (give descriptions)
-
OTHER WORKS @RATE (give descriptions)
-
TOTAL CLAIMED FOR TODAY
SATURDAY
-
CONTRACT NUMBER, NAME AND AREA OF WORKS, FOR THE WORK BEING CLAIMED FOR
-
INSULATION / VCL INSTALLED@RATE
-
MEMBRANE/LIQUID INSTALLED@RATE
-
SUBSTRATE/BALLAST INSTALLED@RATE
-
SLABS INSTALLED@RATE
-
DECKING/PLY INSTALLED@RATE
-
LINEAR WORKS - PARAPET / UPSTANDS / GUTTERS @RATE (give descriptions)
-
PENETRATIONS @RATE (give descriptions)
-
DETAIL WORK @RATE (give descriptions)
-
OTHER WORKS @RATE (give descriptions)
-
TOTAL CLAIMED FOR TODAY
SUNDAY
-
CONTRACT NUMBER, NAME AND AREA OF WORKS, FOR THE WORK BEING CLAIMED FOR
-
INSULATION/VCL INSTALLED@RATE
-
MEMBRANE/LIQUID INSTALLED@RATE
-
SUBSTRATE/BALLAST INSTALLED@RATE
-
SLABS INSTALLED@RATE
-
DECKING/PLY INSTALLED@RATE
-
LINEAR WORKS - PARAPET / UPSTANDS / GUTTERS @RATE (give descriptions)
-
PENETRATIONS @RATE (give descriptions)
-
DETAIL WORK @RATE (give descriptions)
-
OTHER WORKS @RATE (give descriptions)
-
TOTAL CLAIMED FOR TODAY
VAN CHECKS
-
WINDSCREEN WIPERS, AND WASHERS
-
LIGHTS
-
HORN AND MIRRORS
-
TYRE PRESSURE AND DEPTH
-
OIL LEVELS
-
BRAKE FLUID AND OPERATION
-
INTERIOR AND EXTERIOR CONDITION ACCEPTABLE
-
SEAT BELTS
-
BATTERY CONDITION
-
INSTRUMENT PANEL
-
CURRENT MILEAGE
-
I CONFIRM THAT I HAVE CARRIED OUT ALL MY VAN CHECKS IN ACCORDANCE WITH THE DRIVERS LOGBOOK THAT WAS ISSUED TO ME.
WEEKLY SUPERVISOR'S PAPER WORK
-
I CONFIRM THAT I HAVE COMPLETED ALL OF MY SUPERVISOR PAPERWORK, AND SUBMITTED IT ON IAUDITOR.
TIMESHEET TOTAL CLAIM
-
TOTAL CLAIMED FOR THIS WEEK
-
OPERATIVE 1 SPLIT (give name)
-
OPERATIVE 2 SPLIT (give name)
-
OPERATIVE 3 SPLIT (give name)
-
OPERATIVE 4 SPLIT (give name)
-
OPERATIVE 5 SPLIT (give name)
-
OPERATIVE 6 SPLIT (give name)
-
SUPERVISOR SIGNATURE