(*Job Number*) Tithegrove Site Safety Report (*Date*) (*Supervisor*)
-
Client / Site
-
Conducted on
-
Prepared by
Site Set Up
-
Is access to the site clearly signposted with site warning signage displayed? Directions, Company Sign, Warning Board
-
Does the site notice board have relevant safety information displayed, F10, Insurance, HSE Poster, Emergency Contacts, Fire Plan
-
Has office and welfare been established and is it suitable and sufficient for the on-going works; Toilets, Washing facility (Bowl), Hot water, Hand Towels, soap
-
Rest Room/Canteen/ Drying Room; Table, Chair, Kettle, Microwave, Drinking water & cup
-
Are office, toilet and welfare facilities clean, tidy and free from stored materials?
-
Has the electrics in the cabins been checked by a qualified electrician and a certificate of handover on site
-
Is the construction phase health and safety plan available, and specific to site
-
Are method statements and risk assessments in place and are method statements acceptable.
-
Are inductions being carried out prior to work commencement and records kept regarding attendance and competence.
-
Does the safety advisor require an induction and if so has one been given
-
Is the first aid box available and sited correctly and fully stocked
-
First Aid & Accident Management; First Aider on site, FAW certificate, Accident Book, Accident process, First aid Cover
-
Are appropriate levels of consultation being implemented i.e. Safety forums and tool-box talks and are records being kept. Toolbox talk with last month
-
Is the soil report on site
-
Is there an asbestos report on site
-
Is the site complying with any planning requirements
-
Is boundary fencing / security in place and secure preventing unauthorized access?
-
Fire safety; Fire Plan in file or displayed, Emergency Signage, Emergency Lighting, Fire Extinguisher, Assembly point<br>
-
Are the statutory /other registers being completed regularly and correctly e.g. in the last 7 days i.e. Scaffold, excavation, PUWER & LOLER.
-
Site deliveries; Safe unloading area, Method of unloading, Traffic control
-
Are appropriate permits to work being issued, controlled and cancelled?
-
Are site safety inspections being carried out as required and closed out by visiting management.
-
Are COSHH assessments available where necessary.
-
Are all sub-contractors approved
-
Have all sub-contractors’ RAMS been reviewed and assessed as sufficient to continue onsite
-
Is the Site Attendance record being maintained
-
Is there existing drawings or Pre-construction information on site
-
Have suitable signs and barriers been erected.
-
Have all services been identified and isolated
-
Has liaison with neighbours, affected by the works been implemented and is it being carried through.
-
Are unauthorized persons and general public segregated from the works
-
Is the traffic management plan being followed
-
Is the site waste management plan in place and up to date
Training
-
Do all operatives have CSCS cards
-
Do all plant Operators have CPCS cards
-
Has the Site Manager a SMSTS certificate of training
-
Do operatives have suitable training for activities taking place; abrasive wheels, manual handling
Safe Digging Proceedure
-
CAT used prior to excavating (CAT and Genny as required)
-
Permit to dig in place signed and dated by site manager
-
Have all known and located utilities been marked and found by hand
-
Is there a safe means of access (correct ladder or stepped sides)
-
Has the excavation been assessed by a competent person and properly supported or sides reduced by battering if likelihood of collapse
-
Is the area completely confined by barriers to prevent unauthorised access
-
If overhead lines present are there correct warning barriers and signage in place to GS6
-
Are materials stored at an adequate distance from edge of trench
-
Bucket changing area in place and being used for all machines
-
Is the excavator suitable for excavating and lifting
-
Have suitable barriers been put in place to prevent falls
Vibration
-
Is the equipment in use regularly maintained as per the-manufacturers data, is the site able to confirm this
-
Is the daily record sheets up to date and contain the correct information
-
Is there a chart displayed to inform the operatives of the vibration usage times
-
Has all the equipment being used been identified to the operative stating the maximum trigger times not to be exceeded
Confined Space access equipment
-
No damage to the rescue equipment
-
Equipment certificate of test in date
-
Equipment in use meets the lift requirement (harness fitted correctly, correct type of harness, lanyard connected to the hoist)
-
Tripod correctly positioned, winch locked in place correctly, top man able to operate equipment.
Confined Space Working In
-
Permit to Work filled out and filed
-
Is all signage and barriers in place as required to prevent unauthorised access
-
Means of communication established and checked if sufficient
-
All operatives carrying correct training cards for the task they are to perform
-
Is the correct procedure for the works being followed as relevant training
-
Is the gang correct size for the works minimum entry operative and top man
-
Is the gas monitoring equipment calibrated and set correctly
-
Has the gas monitor been checked prior to use
Manual Handling Tasks
-
Has the manual handling task been correctly identified (weight, size, sharp edges etc.)
-
Is the task being performed incorrectly after identification (manual handling kerbs when a curb lifter should be used)
-
Is there adequate risk controls in place ( job rotation, trolleys etc.)
-
Has there been training undertaken by the operative in lifting techniques.
Hazardous Chemicals (including fuel oil and grease)
-
Safe Storage location (away from ignition sources, away from storm drains and water courses)
-
Adequate spill containment (bunded area not overfull) and emergency procedure in place in case of fire /injury/spills
-
Safety Data sheets available on site
-
Sufficient correct P.P.E. for the work process being undertaken (asbestos, weed killing refueling )
-
Suitable storage containers (correctly marked with contents)
Personal Protective Equipment (P.P.E.)
-
Are all operatives wearing safety footwear, helmets and hi-viz tops
-
P.P.E. in good condition not altered or damaged reflective bands still highly visible
-
Is sun barrier cream available
-
Appropriate P.P.E. being used for the task being undertaken if additional hazards identified requiring specific P.P.E. (concreting , Tarmac laying)
Respiratory Protection
-
Are suitable masks available and being worn
-
If cutting is there sufficient suppression (local exhaust ventilation / water suppression)
-
Have the operative been face fitted with the type and design of filters being used within the last 12 months
-
Is the respiratory equipment in a serviceable condition ( Undamaged, clean, maintained)
Work Environment
-
Adequate noise control being deployed in areas where any operative will be exposed to greater than 85 dBA
-
Signage in place to warn other operatives or public to keep clear of hazardous operations
-
Housekeeping on the site to the required standard (lack of trip hazards, broken pipes cut steel contained within a protected area)
-
Adequate noise control being deployed in areas where any operative will be exposed to greater than 85 dBA
-
Signage in place to warn other operatives or public to keep clear of hazardous operations
Electrical Hazards
-
Safe electrical leads not damaged, and positioned to avoid trip hazard hazards and damage
-
110V, or battery only
-
Electrical equipment either double insulated or power source RCD protected and earthed.
Environmental Hazards
-
Hazardous materials adequately contained (cement concrete washout area established ) away from drains and water course
-
Dust suppression system adequate and in use where required
-
Systems in place to prevent pollution or storm water drains and ditches (silt traps or other filtering medium in use)
Chapter 8 Works
-
Advanced signage in place
-
Pedestrian safety in place (barriers away from works or alternative safe routes displayed)
-
Traffic management plan in place agreed with the local authority and correctly implemented
-
Full type 3 P.P.E. worn by all operatives working in/adjacent to the highway
-
Supervisor with correct NSWA card checked the implication of the works prior to start<br>All operatives deployed in the works holding the correct NSWA cards<br>
Site Machinery
-
Have working plant been segregated from other site users
-
All statutory plant checks and inspections in place (12 month thorough examination certificate etc.)
-
All beacons working on active machines
-
Slews fitted with quick hitch mechanism as requested by clients
-
Are seat belts being worn on machinery fitted with them by the operative
-
Machine disabled whilst driver out of seat (keys taken) and left in a safe condition(handbrake applied )
-
Is machinery being driven responsibly (not speeding)
LOLER
-
Are the weekly LOLER check sheets being completed?
-
Is there a suitable Risk Assessment and method statement for lifting including excavators are they being followed?
-
Are moving loads supervised by Competent and trained Slinger / Banksman?
-
Is the Site Supervisor and operator aware of SWL for plant and accessories?
-
Is lifting equipment in good condition with certificates within 12 months available and non return valves or SWL displayed?
-
Are lifting accessories in good condition with certificates within 6 months available and SWL displayed?
-
Are weights available and known to Site Supervisor for materials and equipment, ie. Trench Box’s?
Comments
-
Has a copy of the written report been given to the Site Supervisor or Tempory Supervisor -( Enter Name in comments)
-
STATIC BOX CAN BE USED FOR ISO REFERENCING