Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Are scaffold components and planks in safe working order?
-
Have competent persons been in charge of erection?
-
Is scaffold tower plum?
-
Is the tower height less than 4x the minimum base width?
-
Are sills in place and proper size?
-
On mobile scaffolds, are the wheels locked while in use?
-
Has proper access (ladder) been provided?
-
Is the tower fully braced on both sides?
-
Has the scaffold system been tied or guyed?
-
Have all work platform areas been fully guard railed?
-
Is the platform fully decked?
-
PFSA and guardrails on two-point suspension scaffold?
-
Are scaffold base plates on solid ground?
-
Has fall protection been provided for all fall exposure 10' or more?
-
Are platforms and walkways at least 18" wide?
-
Do platforms 10' or less extend over their support 6-12"?
-
Do platforms greater than 10' extend over their support 6-18"?
-
Is there proper clearance between scaffolding and powerlines?
-
Is scaffold platform clear of excess debris?
-
Have all precautions been taken to prevent falling objects?
-
Is a competent person inspecting the scaffold before use?
-
Have all employees using scaffolding been properly trained in hazards associated with that scaffolding?